
2.
25 Foot Extension Line
Accessory Tray
Bottle Brush
Water Supply Bottle
Folded Tripod
Syringe and Tubing
AA-21ST HVE*
Hose Assembly (Optional)
AA-21ST HVE*
Collection Container (Optional)
Figure 1 - Case Contents
* High Volume Evacuator
AA-61 Water Connector for Scaler
1. The ADU-03ST comes factory-mounted on
a tripod stand.
2. Remove the system from the carrying case
(Fig. 1), fully extend tripod legs, and stand
the system up (Fig. 2).
3. Unit height is adjusted by loosening the
adjustment handle on tripod, raise or lower
system, then tighten adjustment handle.
AA-25ST Saliva Ejector
Assembly (Optional)
SETTING UP THE UNIT:
Figure 2 - ADU-03ST Setup
Fully Extend
Tripod Legs
Tripod Height
Adjustment Handle
Carrying Case
AA-21ST HVE (Optional)
AA-25ST Saliva Ejector
(Optional)