4
EN
1. NOTES • GUIDELINES • GUARANTEE
1.1. GENERAL SAFETY NOTES
• Observe the notes in these operating instructions!
• Observe applicable statutes and regulations, and the notes in these operating instructions, when handling
hazardous materials
• Observe accident prevention regulations and workplace ordinance
•
Ensure that the necessary safety checks are only carried out by authorised staff using original
spare parts
• Only use the hazardous material workplace in a proper condition
• Make sure that there are no air currents above 0.2 m/s when selecting the place of erection as this can affect
the functional apability.
• The users are to be trained on handling of the hazardous material workplace
• The required exhaust air flow is to be provided on site
• Observe the maximum weight with which the cabin may be loaded
• Any hazardous materials that escape must immediately be collected and removed
• Please check the material resistance of all surfaces for the use of aggressive materials.
• The instructions of the supervisory engineering department must be followed.
1.2. GUARANTEE
The guarantee for this product is agreed between you (the customer) and your dealer (the seller). As the
manufacturer, asecos guarantees the products listed in the operating instructions for a period of 24 months
from the date of delivery. All model safety equipment are subject to a compulsory annual inspection by spe-
cialised staff authorised by the manufacturer. Otherwise the customer’s guarantee claim against the manufac-
turer expires.
1.3. DETAILS
Development: asecos GmbH Sicherheit und Umweltschutz, D-63584 Gründau.
Serial No.
type plate inside on top of the work station
Technical drawings
appendix 1
Technical documentation
appendix 2
Hazardous material workplace GAP
Complete capture of hazardous vapours, gases or suspended solids at the place where they emerge or where
they are created before they can have effects that are damaging to health or to the environment (see hazard-
ous materialsregulations, workplace regulations and laboratory guidelines)..
2. ERECTION • COMMISSIONING
2.1. ASSEMBLY OF THE SUPPORT FRAME (WIDTH UP TO 1800 MM)
6
2
2
6
4
4
!
3
2
3
2
2
4
Содержание GAP.095.090
Страница 1: ...EP V 16516 03 10 2017 EN USER MANUAL Hazardous Materials Work Stations ...
Страница 14: ...14 EN ...
Страница 15: ...15 EN ...