
DBT12 Operations Manual....
18
6.
OPERATION
6.1.
POWER TURN-ON PROCEDURE
Turn the circuit breaker to the ON position.
Figure 7: Controls and Indicators
After a few seconds the fan will start spinning and the display will illuminate and show the
model name and software version:
The unit will perform a self-test which requires approximately 2 seconds to complete and then
select the proper gain for the input voltage present and close the input (dock / shore power) and
output (ship power) contactors.
DOCK BOOST TRANSFORMER
Version x.xx
(c)2018 ASEA POWER SYSTEMS
DISPLAY