1-7
WATER PIPING AND FITTING
•
All water pipe must be adequately insulated to prevent capacity losses and condensation.
•
Install a 40 to 60-mesh strainer to ensure good water quality.
•
Water pipes recommended are black steel pipe and copper pipe.
•
During installation, the piping of the unit should be clamped before rotating the installation pipe to reduce the moment
induce on the piping.
•
Users are recommended to install the pipes and accessories as shown in Figure 6.
•
An air vent must be installed at the highest position, while a drainage plug at the lowest position of the water circuit. After
the leak test (0.6MPa), open the air vent to release any air trapped in the water circuit.
•
Run the clean water through the water inlet and operate the pump to drain out the dirty water. Clean the strainer after
running the pump for 30 minutes.
•
Fill up the water circuit after connecting the pipes and equipment. Check water leakage at all connections and joints. Do
not start the unit when the system is leaking.
•
To optimize the capacity of the system, ensure that the system is free of air bubbles. The air trapped in the system would
make the system unbalanced.
!
!
!
!
!
CAUTION
•
Do not allow water to remain in the water pipes if the unit is not operating for a long period.
Water must be drained out if the unit is not running during winter. Failing to do so would cause the pipe to crack.
•
Do not drink the chilled water in the unit.
P
P
4AC/AC 20/25/30 C/CR
4AC/AC 40/50/60 C/CR
PRESSURE GAUGE
GATE
VALVE
GATE
VALVE
BALANCING
VALVE
THERMOMETER
FLEXIBLE
GATE VALVE (LOWER
POSITION FOR DRAINAGE)
AIRVENT (INSTALL
HIGHEST POSITION)
FAN COIL UNIT/AIR HANDLING UNIT
GATE
VALVE
Figure 6
THERMOMETER
GATE VALVE
GATE VALVE
BALANCING
VALVE
STRAINER
CHECK
VALVE
MAKE UP
VALVE
BYPASS VALVE
(DIFFER ENT PRESSURE TYPE)
PRESSURE GAUGE
GATE
VALVE
GATE
VALVE
BALANCING
VALVE
THERMOMETER
FLEXIBLE
GATE VALVE (LOWER
POSITION FOR DRAINAGE)
AIRVENT (INSTALL
HIGHEST POSITION)
FAN COIL UNIT/AIR HANDLING UNIT
GATE
VALVE
THERMOMETER
GATE VALVE
GATE VALVE
BALANCING
VALVE
STRAINER
CHECK
VALVE
MAKE UP
VALVE
BYPASS VALVE
(DIFFER ENT PRESSURE TYPE)
ELECTRICAL AND WIRING
•
Refer to the wiring diagram provided on the unit when making electrical wiring.
•
Do not ground any electrical equipment to the water piping.
•
Install an external isolator switch (if it is not provided) to prevent electrical shock.
Содержание 4AC20C
Страница 1: ...AIR COOLED CHILLER C Series INSTALLATION MANUAL IM ACC1 2 0703...
Страница 2: ......
Страница 12: ...TB1 R S T N N L1 L2 L3 Power supply 400V 3Ph N 50Hz 4AC AC40 50 60 C CR AC TERMINAL BOX ISOLATOR E FUSE x...
Страница 94: ...6 1 8 11 11 R407 11 12 13 14 15 15 i ii iii viii ix x 1 2 4 5 7 7 8 1 11 2 1 577 550...
Страница 95: ...6 2 500 500 500 1500 3 500 2...
Страница 96: ...6 3 100 50 5 0 C 300 2 50 50 100 5 500 1000 1000 500 1500 4 500...
Страница 97: ...6 4 4AC AC 020 025 030 C CR 4AC AC 040 050 060 C CR...
Страница 100: ...6 7 P 40 60 P 6 0 6 30 P 4AC AC 020 025 030 C CR 4AC AC 040 050 060 C CR 6...
Страница 102: ...6 9 P P 4AC AC 020C 025C 030C 4AC AC 040C 050C 060C 70 03 4 067460 70 03 4 087461...
Страница 103: ...6 10 P P 4AC AC 020CR 025CR 030CR 70 03 4 067458 4AC AC 040CR 050CR 060CR 70 03 4 067459...
Страница 104: ...6 11 R22 R407C R407 R407C R407C R22 R407C R22 R407C R407C R22 R407C R407C R22 i ii iii iv v vi R407C R407C R407C R407C...
Страница 105: ...6 12 1 2 3 4 3 c 1 2...
Страница 106: ...6 13 7 7 1 3 2 CN8 CN2 CN5 4 3 1 2 A A A B B B 12V 12V 12V GND GND GND JP13 CN8 CN2 CN5 00 01...
Страница 107: ...6 14 1 2 3 4 pa...
Страница 109: ......
Страница 111: ...dOG e d b d b q K q K q K q K q K C VO d VO...
Страница 112: ......
Страница 114: ...English d d U V w WM U l u w WH K D U U U s U _ cN UJ s VM tO M tO M tO M tO M tO M ii...
Страница 121: ...UF U VO d TB1 L L1 N L2 N L1 4AC AC20 25 30 C CR E u X u eN WOzU dNJ bI H e d U d UO K w dD bMB AC WL U ix...
Страница 122: ...English u X u eN WOzU dNJ bI H e d U d UO K w dD bMB AC WL U TB1 R S T N N L1 L2 L3 4AC AC40 50 60 C CR E x...
Страница 139: ......