background image

This Quickstart guide, along with the in-built help, will help 
you get the best out of your Sigma IHT.

The Sigma Intelligent Hand-held Terminal (IHT) provides full load 
control and three-phase instrumentation on any Froment Sigma-
equipped load bank.

1. Connect up to the load bank

Keep people well away. Close all doors. Ensure cables and 

earthing are adequate. Risks include fire and burns from the hot 

air outlet and electric shock.

Before you can start using the IHT to test the supply, the load 
bank and supply must be cabled up.

• 

After connecting the power cables between the load 
bank and supply, ensure the IHT is plugged into the Load 
Bank IN socket.

• 

Ensure that the supply on test is operational and any 
circuit breakers are closed.

• 

Power-up the Load Bank control circuit.

Both the load bank ‘Stop’ and ‘Start’ lamps will light up. After 
about 15 seconds the ‘Start’ lamp will go out, you can now press 
the ‘Start’ button.

If you look at the IHT you will briefly see the start-up logo and, 

assuming all is well, the 

SETTINGS

 page with the 

SUPPLY ON 

TEST

 details will be finally displayed.

The top line of the screen is the status line. This always displays 
where you are (such as 

SETTINGS

TEST

 or 

OPTIONS

) and 

what page you are on. So 

SETTINGS

 1-2, shows that you are in 

settings on page 1 of 2. The bottom line displays the function key 
labels. This indicates the purpose of the function keys F1 to F4.

2. Help

It is quite possible that when you pick up the IHT for the first 

time you will see the 

SUPPLY ON TEST

 help page.

Help is displayed automatically on the settings and test pages 
after 12 seconds with no activity. This automatic help will only 
be displayed once.

• 

You can press the Up and Down function keys (F1 and F2) 
to scroll through the help.

• 

Press OK (the F4 key) when you have finished.

HELP

 function key is available which provides context sensitive 

help for all messages and options pages.

3. Set the Supply Size

You need to set the details of the supply on test before 
applying any load.

The 

SUPPLY ON TEST 

details on the first 

SETTINGS

 page are 

used to calculate percent load and to avoid over-loading the 
supply. A warning symbol is displayed if the load bank may not 
be large enough to test the supply.

When in 

SETTINGS

 you can press the 

+

 and 

 keys to quickly 

change the screen contrast.

• 

Press 

NEW

 from 

SETTINGS

.

By pressing 

NEW

 the voltage, frequency and number of phases 

will be set automatically using the measured values. The supply 
size (kVA) can then be edited.

The supply must be present on the load bank bus-bars for the 
automatic setting to work. Note that the 

NEW

 function is not 

available when load is applied (the green LED illuminated).

Use 

EDIT

 if you want to manually change the supply details.

Read the load bank manual before use and take
special note of all the safety warnings.

Froment

Sigma IHT Version 4 - Quickstart Guide

Содержание Froment SIGMA IHT Version 4

Страница 1: ...Froment SIGMA IHT Version 4 Quickstart Guide ...

Страница 2: ...ion key labels This indicates the purpose of the function keys F1 to F4 2 Help It is quite possible that when you pick up the IHT for the first time you will see the SUPPLY ON TEST help page Help is displayed automatically on the settings and test pages after 12 seconds with no activity This automatic help will only be displayed once You can press the Up and Down function keys F1 and F2 to scroll ...

Страница 3: ...AGE to change to the next page When finished press OK to go back to SETTINGS Then press TEST to start testing The OPTIONS are automatically saved so you only need to set them once 5 Apply Load There are four TEST pages which offer different views of the instrumentation When you select TEST for the first time the following page is displayed You can select and apply load on any of the four TEST page...

Страница 4: ...whereas page three shows line neutral voltages The fourth TEST page provides a graphical view of the voltage and frequency when the last load was applied The voltage and frequency graphs display the first 6 seconds of the last load change as a percentage of the supply voltage and frequency rating Use this page when testing governor and AVR transient response 7 Using Automatic Load Control At any t...

Страница 5: ...N J Froment Co Ltd Easton on the Hill Stamford PE9 3NP UK T 44 0 1780 480033 E sales froment co uk W www froment co uk ...

Отзывы: