9
IHT Technical Reference
IHT Quick Start
F4
OK
F2
NEW
F4
T
ES
T
P
ress the “Start” button on
the load bank control
panel .
P
ress F1 (CHECK)
to go to the Supply on
T
est
Settings
P
age.
Settings not correct?
P
ress F2 (NEW).
T
he
voltage and frequency will be measured and
set to the nearest standard values (If there
is no supply they will be set to defaults).
Use the + or – keys
(or F1
P
RESE
T
) to
adjust the supply
size.
P
ress F4 (OK) when the
values match those on
the generator’s rating
plate.
If the Supply on
T
est settings are correct,
press F4 (
T
ES
T
) to start testing the supply.
T
est 1-4 is the first of the
four test instrumentation
pages provided by the
IH
T
.
Select the percentage load
required using the + and -
keys.
P
reselect the
percentage load
required for the next
load change using the +
and - keys.
A pop up will appear showing
the adjusted value and this is
also displayed on the right of
the status line.
Apply the load by pressing the key.
T
he LED
will light, indicating a test in progress.
P
l
ress
the key a second time for load correction.
l
T
he status line displays
the elapsed time since
the load was applied.
P
ress the O key to reject the
load and end the test.
F1
CHECK
Figure 1-7
IHT quick start manual test sequence.
Содержание 1251794
Страница 1: ...P N 1251794 4900 Load Bank User Manual ...
Страница 39: ...ASCO ...
Страница 40: ...ASCO ...
Страница 41: ...ASCO ...
Страница 42: ...ASCO ...
Страница 43: ...ASCO ...
Страница 44: ...ASCO ...
Страница 45: ...ASCO ...
Страница 46: ...ASCO ...
Страница 47: ...ASCO ...
Страница 48: ...ASCO ...
Страница 49: ...ASCO ...
Страница 50: ...ASCO ...
Страница 51: ...ASCO ...
Страница 52: ...ASCO ...
Страница 53: ...ASCO ...
Страница 54: ...ASCO ...
Страница 55: ...ASCO ...
Страница 56: ...ASCO ...
Страница 57: ...Intelligent Hand held Terminal IHT Technical Reference Manual ...
Страница 58: ......
Страница 63: ...IHT Technical Reference ...
Страница 95: ......
Страница 96: ...www froment co uk ...