11
ENGLISH
Voltaje
Model Machine code Machine number
Current rate
Cicles
Power
Voltage
Boiler capacity
Boiler pressure
Manufacture date
R =
PHASE
/FASE
S =
PHASE
/FASE
T =
PHASE
/FASE
N =
NEUTRAL
/
NEUTRO
BL =
BLUE
/AZUL/BLU/
BLAU/BLEU
YG =
YELLOW-GREEN
/
AMARILLO-VERDE/
VERDE GIALLO/
GELB-GRÜN/JAUNE-VERT
BR =
BROWN
/MARRÓN
MARRONE/BRAUN/MARRON
BK =
BLACK
/NEGRO/
NERO/SCHWARZ/NOIR
GR =
GREY
/GRIS/GRIGIO/
GRAU/GRIS
The power supply cable must be connected to the connection provided according to
current regulations.
Disconnecting means must be incorporated into the fixed installation in accordance
with the installation regulations.
ATTENTION!
It is essential to connect the machine to a properly grounded connection.
ATTENTION!
The machines model BARISTA T 2/3 groups are configured to make a two-phase
(1/2 GR) / three-phase (3 GR) connection, as indicated in the diagram incorpo-
rated into the connection cable. Special attention must be paid to the connection
of each of the phases as well as the cable corresponding to the neutral of the
electrical system.
MANUAL BARISTA T ENG-ESP_DE-----actualizado marzo2019.indd 11
20/06/2019 12:07:14