19
Point level switch
Commissioning
19
A0017369
14
Testing the internal switch
7
Commissioning
7.1
Post-installation and post-connection check
Checklists:
• Post-installation check(→ 13)
• Post-connection check(→ 16)
7.2
Setting the switching pressure
The switching threshold can be adapted to the weight of the bulk solids in 3 stages via an
operating element that is accessible from above (also possible during operation):
• Minimum: 80 g/l (4.99 lb/ft³)
• Depending on the density of the bulk solids adjustable in three stages: low, medium
(default), high
7.3
Switching on the device
The shaft starts to turn as soon as the supply voltage is switched on. The rotational movement
can be observed from the outside.