Installation, Operation and Maintenance Manual
【
H-A070-E-3
】
3-Way Ball Valve Type23 Pneumatic Actuated Type AR 15-50mm (1/2”-2”)
15
13. Air piping procedure
- Do not remove a dust-proof cap provided to piping port before piping work starts.
- Avoid excessive tightening for joint. (The threaded area can be damaged.)
- Check the connection locations, air pipe sizes, and screw types with the approved drawings
and other documents for the product. Then lay the air piping.
- Use dehumidified and dust-removed clean operation air. When using highly dry air at a dew
point of -40°C or less, please consult us separately.
- If the actuator is used in an environment below 5°C temperature, its operating fluid must be
free from the water and moisture contained in it because of possible problems due to the
freeze.
- Steel pipes must always be of the plated.
- Before installing an actuator in pipeline, flash the inside of pipeline completely.
- When connecting the air piping, be careful not to let foreign matter inside the piping.
- Threaded area of a pipe must be free from the sharp edges and burr.
●
Steel pipe or tube for piping
●
Joint for steel pipe or tube
●
Spanner wrench
●
Sealing tape
<
For a standard type and an attached speed controller type
>
Procedure
1) Wind a sealing tape around the external thread of joint, leaving the end (about 3mm) free.
2) Screw the joint in the piping female screw of the actuator by hand fully.
3) Screw the joint one turn with a spanner wrench.
- Avoid excessive tightening for joint. (The threaded area can be damaged.)
4) Mount a steel pipe or a tube.
Standard type or
with speed controller
Double acting
Air to open / Air to shut
AR040DA20
AR050DA30
AR040NC20
AR050NC30
AR063NC40
Standard type
With speed controller
Necessary items
Caution
Caution