3
TABLE OF CONTENTS
3
Zoning Glossary
4
When Installing This Product . . .
4
General System Operation
4
Locating and Mounting the Control Panel
4
24-Volt Power Supply and Grounding
5
Thermostats
5
Equipment Set-Up (Furnace/Heat Pump)
6
HVAC Output
6
Zone Solenoids
7
Staging with Single-Stage or Two-Stage Thermostats
7
Second-Stage Heating and Cooling Delay and Timer Settings
7
Heat Pump Control Operation: Emergency Heat Operation
8
Heat Pump with Fossil Fuel Back-Up Heat (Dual Fuel Systems)
8
Three Way Priority System: Heating - Cooling - Automatic
8
Call Waiting
9
Energy Conservation Cycle (ECC)
9
ECC Bypass
9
Compressor Lockout TDO 1 (Stage 1) and TDO 2 (Stage 2)
9
Fan-On-Heat Operation
10
Master Zone Control (MZC)
10
LAT Limit Controls for Heating and Cooling
11
Sensor Verification Test
11
Smart Slave Zone (SSZ )/Slave Thermostats
12
Air Pump Operation
12
Manual Pump Switch (MPS )
13
Damper Installation Procedures (Round)
14
Damper Installation Procedures (Square and Rectangular)
15
Air Tube Connection
15
Identifying the Zones
15
Damper Position Indicator
16
Bypass Damper Installation, Adjustment and Checkout
17
System Checkout
Rev.5/01/01
U.S. and Foreign Patents & patents pending. © copyright 2004 by Arzel Zoning Technology, Inc.
Page No.
Topic