TurboStack Hubs with Management
15
10. Secure the module in the chassis slot by screwing the module in place
(see Figure 9). Then, snap closed the plastic doors.
11. Connect your data cables to the hub and the network. Check the Link
indicators.
12. If one or more of the ports on the module are transferring data, the
Receive indicator will illuminate.
13. The module is now active in the chassis as a component of a network
concentrator.
For confirmation, you can obtain hub and port status information via
network management. To enable management from a PC monitor, the PC
must be connected to the Master through the Master’s RS232 port. For
further details, refer to the
TurboStack™ AT-S10 Firmware Module For
TurboStack Hubs Operations Manual.
Figure 9: Installing a Module
in a Chassis
Plastic
door/handle
Module
screws
Chassis frame
Module
guide rail
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com