TRACKPOINT 3
OPERATION
3-10
TRACKMAN BOOT-UP SCREEN
Sensor Setup Node – Displays setup paths for the various input sensors such as Compass and
Pitch/Roll.
Beacon Node - The Beacon node provides access to the Beacon List window (via the 'Beacon(s)'
entry) as well as individual access to the Beacon Setup dialog window for previously defined bea-
cons whose names show as sub-nodes to the Beacon Node.
The Project Tree window can be undocked from the Main Window making the entire client area of
the Main Window available for MDI Child Windows (such as the Plotting Grid). To undock hold down
the right mouse button while over the Project Tree, move the mouse pointer outside the Main Win-
dow's boundary, and release the mouse button. To re-dock hold down the right mouse button while
over the Project Tree, move the mouse pointer inside the Main Window's boundary, and release the
button. The undocked ('floating') Project Tree window can be brought into view at any time via the
'Project' entry of the Main Menu's ' View' menu, or via the System Menu's or Tray Menu's 'View Pro-
ject' entry.
Содержание TRACKPOINT 3 4211A
Страница 3: ......
Страница 5: ......
Страница 13: ...PRECAUTIONS viii ...
Страница 14: ...SECTION ONE GENERAL INFORMATION ...
Страница 15: ......
Страница 18: ...TRACKPOINT 3 GENERAL INFORMATION 1 3 TRACKPOINT 3 CONSOLE FRONT VIEW FIGURE 1 1 ...
Страница 20: ...TRACKPOINT 3 GENERAL INFORMATION 1 5 TRACKPOINT 3 SYSTEM COMPONENTS FIGURE 1 3 ...
Страница 21: ...TRACKPOINT 3 GENERAL INFORMATION 1 6 FIGURE 1 4 ...
Страница 27: ...TRACKPOINT 3 GENERAL INFORMATION 1 12 ...
Страница 28: ...SECTION TWO INSTALLATION ...
Страница 29: ......
Страница 34: ...TRACKPOINT 3 INSTALLATION 2 5 FIGURE 2 2 ...
Страница 35: ...TRACKPOINT 3 INSTALLATION 2 6 FIGURE 2 3 ...
Страница 38: ...TRACKPOINT 3 INSTALLATION 2 9 MODEL 4740A INSTALLATION FIGURE 2 5 ...
Страница 39: ...TRACKPOINT 3 INSTALLATION 2 10 FIGURE 2 6 C A U T I O N ...
Страница 52: ...TRACKPOINT 3 INSTALLATION 2 23 FIGURE 2 15 ...
Страница 53: ...TRACKPOINT 3 INSTALLATION 2 24 FIGURE 2 16 ...
Страница 56: ...TRACKPOINT 3 INSTALLATION 2 27 FIGURE 2 17 ...
Страница 62: ...SECTION THREE OPERATION ...
Страница 63: ......
Страница 132: ...TRACKPOINT 3 OPERATION 3 69 ...
Страница 177: ...SECTION FOUR PRINCIPLES OF OPERATION ...
Страница 178: ......
Страница 183: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 5 ...
Страница 185: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 7 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3A ...
Страница 186: ...TRACKPOINT 3 PRINCIPLES OF OPERATION 4 8 TRACKPOINT BLOCK DIAGRAM FIGURE 4 3B ...
Страница 189: ...SECTION FIVE MAINTENANCE ...
Страница 190: ......
Страница 193: ...TRACKPOINT 3 MAINTENANCE 5 1 DSP CARD PROGRAMMING MODE JUMPER FIGURE 5 1 ...
Страница 201: ...APPENDIX A CARE OF CABLES ...
Страница 202: ......
Страница 204: ...TRACKPOINT 3 APPENDIX A A 2 ...
Страница 205: ...APPENDIX B STATIC DISCHARGE ...
Страница 206: ......
Страница 208: ...TRACKPOINT 3 APPENDIX B B 2 ...
Страница 209: ...APPENDIX C WARRANTY ...
Страница 210: ......
Страница 212: ...TRACKPOINT 3 APPENDIX C C 2 ...
Страница 213: ...APPENDIX D DRAWINGS ...
Страница 214: ......
Страница 216: ...TRACKPOINT 3 APPENDIX D D 2 ...
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......
Страница 235: ......
Страница 236: ......
Страница 240: ......
Страница 241: ......
Страница 242: ......
Страница 244: ......
Страница 246: ......
Страница 247: ......
Страница 248: ......
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ......