9
SPA START-UP
Please read each step of the Start-up section prior to doing the
step.
SELECTING A LOCATION
In preparation for installing your new Artesian spa, you should en-
sure that your chosen location meets some minimum guidelines:
1) Place your spa on a surface that is large enough for the entire spa
to fit. Consider the space needed to easily access equipment compart-
ments and circuit breakers. Remember, all electronics must be kept
dry.
2) The spa must be on a solid, level foundation. Recommended: 4 in
cement slab that has cured for at least 72 hours. Your warranty will be
voided if the spa is not properly installed. Structural damage due to an
improper foundation is not covered under warranty.
3) To avoid potential water damage to the skirt and frame, your spa
should be placed on a site where it will not be in the way of water sprin-
klers.
(4) OUTDOOR SPAS: Consider building codes, electrical and plumb-
ing codes, desired proximity to house, wind and sun exposure, location
of trees (falling leaves, shade), dressing area, landscaping and lighting
when selecting a location.
5) INDOOR SPAS: Floor surface must have traction to prevent slipping
when wet. A floor drain is optimum. As room humidity will increase
because of the spa, provide ample ventilation to prevent dry rot, mildew
and mold. Use materials that will withstand humidity. There may be a
need for cross-ventilation fans and/or dehumidifiers. The spa chemicals
may corrode some household metals. Provide ample room if servicing
should be needed. Strong foundational support is vital, particularly if a
second-story site is selected.
6) Ensure the equipment compartment is in a location where it will not
be damaged by water drainage. Cover the equipment compartment
with a heavy screen if rodents are a problem. Damage due to rodents
is not covered under warranty.
7) Have the spa deck installed by a knowledgeable contractor to ensure
proper support.
Содержание PLATINUM ELITE
Страница 1: ......
Страница 2: ...Notes...
Страница 3: ...PLATINUM ELITE CLASS WWW ARTESIANSPAS COM Part 11 1311 11...
Страница 4: ...2013 Artesian Spas May Manufacturing LLC Last Revised1 31 2013 Subject to change without notice...
Страница 13: ...7 60 Hz GFCI WIRING SCHEMATIC...
Страница 14: ...8 50 Hz ELECTRICAL SERVICE OPTIONS Single Service 230 VAC 50 Hz 1 x 32A 3 Service 400 VAC 50 Hz 3Np 32A...
Страница 70: ...64 INTERIOR SPA DIAGRAM...
Страница 71: ...65 1 Spa Pack 2 Heater 3 Therapy Pump 4 24 hr Circulation Pump...
Страница 72: ......
Страница 75: ......
Страница 76: ......