Attach Floor Frame Assembly
6
Do not fasten decking material at this time!
NOTE:
FLOOR FRAME MUST BE LEVEL AND
SQUARE BEFORE PROCEEDING!
If you are using decking material, complete the
floor frame assembly for the storage building as
shown in the assembly instructions found in the
building carton.
Position floor frame assembly
on base kit, equal distance on the sides, front
and rear.
Disregard statement in building instruc-
tions and anchor front and rear floor frames at dimen-
sion shown to side channels and side
floor frames to cross channels using bolts and nuts.
*
If you are using the base kit as a finished form to pour
concrete, see next page. Pour concrete first, then
attach the floor frame assembly using concrete an-
chor bolts, available at your local building supply
store.
RAMP MUST BE FASTENED TO FRONT FLOOR FRAMES
SO THAT HOLES AT 5/16" 0,8 CM ARE TOWARD THE
FRONT TO LINE UP WITH HOLES IN BASE KIT CHANNELS
AT 2" 5,1 CM DIM.
8x6, 10x6
NOTE: LEAVE RAMP OFF UNTIL
FASTENED TO BASE
USE SLOT
NOTE: PICK UP COMPLETED KIT TO ATTACH
NUTS TO BOLTS AT THESE TWO LOCATIONS.
(10x9 Illustrated)
2" 5,1 cm
2" 5,1 cm
SIDES & REAR
5/16"
0,8 cm
4x10
*
If there are no anchor holes in floor frames, or they do not line up:
Assemble the base kit to match the floor frames, and drill 1/4" (6 mm)
dia. holes at the cross members for attachment with bolts and nuts
provided.