Step 4
BO14
Parts Needed For
Roof Channel
Assembly
Get help holding post in place while
attaching the roof channel.
1
Position a roof channel, with small
hole 1 1/8" (2,9 cm) from end at left
post, and fasten to channel brace using
four #10-32x 7/16" (11 mm) bolts and
square nuts. Fasten other end to the
top end of the left post, noting location
of lock seam, using two #10-32x7/16"
(11 mm) bolts and square nuts, and
two #10Ax3/8" (10 mm) screws.
2
Fasten a front roof channel, with
most holes in fl ange on top, to the front
of left post, using the same fasteners,
with opposite end overlapping right
post, fasten as before. Brace center
of unit with 2x4's (38 mm x 89 mm)
as shown.
3
Repeat procedure with next roof
channel, as done in Step 1 to right
post and channel brace.
9656 Roof Channel (two)
Post Assemblies (two)
9733 Front Roof Channel (one)
9733
1 1/8"
(2,9 cm)
Lock Seam
Most Holes in Flange on Top
9661 Left Post
#10-32 Square Nut
9656
STEP
1
STEP
2
#10Ax3/8"
(10 mm) Screw
#10-32x7/16"
(11 mm) Bolt
1 1/8"
(2,9 cm)
14