40
Assemblies from Step 16:
• Right Door Assembly (1)
• Left Door Assembly (1)
(QTY: 8)
Closed Position
Half-Open Position
INSIDE BUILDING
Front Floor Frame
Door
Door Slide
Door Track
Gable
From inside the building, place the
bottom of the
Door
into the
Front
Floor Frame
track at about the
half-open position.
1
Rotate the
Door
forward until it is
vertical and align the
Door Slides
with the
Door
.
2
Insert two (2) black screws into
each
Door
Slide
as shown below.
Repeat steps for second
Door
.
3
If Doors do not align, raise or lower one side of the Door by placing
the Door screws through a diff erent set of holes in the Door Slide.
Door Adjustment
You will need for this page:
Step 16: Door Install
41AW
Содержание LM101267
Страница 44: ...ASSEMBLY NOTES 46A 44 ...