26
You will need for this page:
Step 13: Door Installation & Adjustment
From inside the building, put the
bottom of the right door assembly
(on your left when you are inside)
behind door jamb into the front
fl oor frame track.
1
3
Fasten the door to the door
slides using two #10Bx1/2” (13
mm) screws per door slide.
2
Position the top of the door so
that the holes in the door line up
with the holes in the door slides.
26BL
4
Repeat steps 1 through 3 for the left door.
The holes in the door slides allow
you to adjust the doors. Place the
door in the middle holes.
Closed Position
Half-Open Position
INSIDE BUILDING
Front Floor Frame
Door
Door Slide
Door Track
Gable
If Doors do not align, raise or lower one side of the Door by placing
the Door screws through a different set of holes in the Door Slide.
Door Adjustment
Assemblies from Step 12:
• Right Door Assembly (1)
• Left Door Assembly (1)
(QTY: 8)
Содержание EPA64
Страница 9: ...ASSEMBLY BY KEY NO 9 09BL 15 15 10 10 12 12 14 14 22 21 21 20 13 13 18 16 19 20 24 17 2 2...
Страница 10: ...ASSEMBLY BY KEY NO 10 10BL 7 6 23 17 3 4 5 1 11 11 9 9 8 8 8 8 Doors Roof...
Страница 30: ...ASSEMBLY NOTES 46A 30...
Страница 31: ...ASSEMBLY NOTES 46A 31...
Страница 32: ...ASSEMBLY NOTES 46A 32...