background image

The Base For Your Building

FRONT

(DOOR)

FRONT

(DOOR)

Base

     B09

Note: Finished Slab dimensions, with lumber removed.

No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is 

recommended as an eff ective method of properly securing your building after assembly is complete.

OPTION 1: Directly on ground (earth)

Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).  If you choose this option Arrow has a simple kit available to 

provide a fl oor inside the shed to keep stored items off  the ground.  This kit can be used to support a plywood fl oor (wood not included) 

or be fi lled with sand/rock to provide a solid surface. (Order No. FB106-A or 68381-A)

Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.

These are the recommended materials for your base:

 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber 

 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade   NOTE:  Pressure Treated Lumber must not be used where it  

    will make contact with your storage building.  The properties of Pressure Treated Lumber will cause accelerated corrosion.  

If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.

 10 & 4 penny Galvanized Nails  Concrete Blocks (optional)

The platform should be level and fl at (free of bumps, ridges etc.)

to provide good support for the building. The necessary materials

may be obtained from your local lumber yard.

To construct the base follow instructions and diagram.

Construct frame (using 10 penny galvanized nails)

Measure 16"/24" (40,6 cm/61,0 cm) sections to construct 

inside frame (see diagram)

Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and fl at to provide good support for the frame.

The following are the recommended materials for your base.

 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)

 Concrete  Sheet of 6 mil plastic

 We recommend for a proper strength concrete to use a mix of:

 1 part cement  3 parts pea sized gravel  2 1/2 parts clean sand

Prepare the Site/Construct a Base

1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).

2. Fill up to 4" (10,2 cm) in the square with gravel and tamp fi rm.

3. Cover gravel with a sheet of 6 mil plastic.

4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)

    lumber.

5. Pour in concrete to fi ll in the hole and the frame giving a 

   total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

                                                                                        

 

Note: Platform/Slab will extend 9/16" (1,4 cm) beyond fl oor

 frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a

 roofi ng cement (not included), or bevel this 9/16" (1,4 cm) of 

concrete when pouring, for good water drainage.

97 1/2"

247,7 cm

16"/24"

40,6 cm/61,0 cm

68 3/4"

174,6 cm

9

68 3/4"

174,6 cm

97 1/2"

247,7 cm

Содержание 697.68616A

Страница 1: ...1 7 m 247 7 cm x 174 6 cm 253 4 cm 181 0 cm 201 0 cm 240 7 cm 167 6 cm 197 8 cm 110 5 cm 175 9 cm CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MIS...

Страница 2: ...in altre lingue disponibile online Per accedere effettua la scansione del codice QR in basso PT Manual de montagem dispon vel em outros idiomas online Digitalize o c digo QR abaixo para obter acesso...

Страница 3: ...s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a...

Страница 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Страница 5: ...weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions an...

Страница 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Страница 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...c to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galv...

Страница 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Страница 11: ...2 left 67468 Peak Cap 2 66045 Handle 2 66646 Washer 176 5 sheets of 40 65004 8Ax5 16 8 mm Screw 282 65923 8 32x3 8 10 mm Bolt 93 65900A 10Bx1 2 13 mm Black Screw 8 Packed with Screws 65103 8 32 Hex Nu...

Страница 12: ...Floor Frame 2 11 5288 Corner Post 4 12 9342 Side Wall Angle 2 13 5287 Splice Post 1 14 7311 Door Jamb 2 15 9344 Siding Stud 6 16 8719 Side Siding 6 17 6658 Gable Brace 2 18 9345 Rear Siding 6 19 9746...

Страница 13: ...Assembly by Key No 13 BT13 31 31 31 31...

Страница 14: ...floor frames as shown The holes in these pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the rear floor fr...

Страница 15: ...ear wall Pro ceed as follows 1 Overlap the right and left rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 2 Set the assembly aside You will use...

Страница 16: ...the two gables and support the roof panels The main roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws...

Страница 17: ...as shown 2 Insert four screws from the underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door...

Страница 18: ...front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood platfor...

Страница 19: ...bly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly today A partially assembled building can be severely damaged...

Страница 20: ...mbs to the door track with two screws Do the same for the bottom into frame There must be a 7 8 2 2 cm gap between end of ramp and edge of door jamb Notched edge faces toward center of building Fasten...

Страница 21: ...orner posts at the sides Position stud inside top angle and fasten with a screw at the lower hole 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for...

Страница 22: ...siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten sid ing to corner posts using screws 5 Repeat steps 1 through 4 for op posite side of bu...

Страница 23: ...t and door jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 9345 Rear Siding 6 9746 Front Siding 6 Parts Needed For R...

Страница 24: ...efore continuing 1 Apply edge trim to the top edge of the right gables and left gables 2 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket...

Страница 25: ...to center gable leg 2 Join the left and right gables together with a gable brace using a bolt in the bottom two holes only 3 Repeat Steps 1 2 for the door track on the front of building except for th...

Страница 26: ...other end of the main roof beam to the gable brace of the rear gable 3 Fasten the remaining roof beams small holes on top as shown using bolts Main Roof Beam 1 8474 Roof Beam 2 Parts Needed For Roof...

Страница 27: ...assemble prior to attaching the roof panels 1Locatetheroofpanelsbytheirnum bers Note the sequence and position they are to be installed 8466 Right Roof Panel FRONT Washer Bolt Gable STEP 1 Nut 1 8467...

Страница 28: ...n roof panel overlaps not used for ridge cap roof center Cover the head of bolt with the 2 5 1 cm piece of weather stripping tape NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjace...

Страница 29: ...Side Roof Trim Peak Cap 5 STEP STEP 3 8482 6 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and inde...

Страница 30: ...cal door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Put a...

Страница 31: ...oor slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repea...

Страница 32: ...d In addition to protecting against weather infiltration the washers protect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may a...

Отзывы: