506859-01
Issue 1236
Page 28 of 32
Start-Up and Performance Checklist
Job Name _____________________________ Job No. ____________
Date ___________
Job Location ___________________________ City _______________
State ___________
Installer _______________________________
City _______________
State ___________
Unit Model No. _________________________
Serial No._____________________________
Service Technician _______________________
Nameplate Voltage _____________________
Rated Load Ampacity _________ Compressor Amperage ________
Outdoor Fan __________
Maximum Fuse or Circuit Breaker ________________________
Electical Connections Tight? Indoor Filter Clean? Supply Voltage (Unit Off) __________
Indoor Blower RPM ___________________ S.P. Drop Over Indoor (Dry) ____________________
Outdoor Coil Entering Air Temperature ________ Voltage with Compressor Operating __________
Discharge Pressure ___________________ Vapor Pressure ____________________
Refrigerant Lines: Charge Checked? Outdoor Fan Checked?
Refrigerant Lines: Leak Checked? Properly Insulated?
Service Valves: Fully Opened? Caps Tight?
Thermostat: Calibrated? Properly Set? Level?
Содержание 4SCU 16LS Series
Страница 8: ...506859 01 Issue 1236 Page 8 of 32 Figure 9 Figure 10 ...
Страница 19: ...506859 01 Issue 1236 Page 19 of 32 Figure 14 CONTROL BOARD ...
Страница 24: ...506859 01 Issue 1236 Page 24 of 32 Information will be displayed but does not apply to this product ...
Страница 25: ...506859 01 Issue 1236 Page 25 of 32 ...
Страница 29: ...506859 01 Issue 1236 Page 29 of 32 4SCU16LS124 160 Wire Diagram ...
Страница 30: ...506859 01 Issue 1236 Page 30 of 32 4SCU18LS124 160 Wiring Diagram ...