3) Centre of Gravity
Before each flight, or equipped, replaced the mission equipment, the user need to
manually measure the current centre of gravity of the UAV from the design.
If the current centre of gravity deviation is too large (more than 3 mm deviation from
factory marked position), user need to move the mission equipment installation
location, make sure it comply with factory UAV design requirement.
110mm
CG
Do not squeeze the folded DuPont cable during installation, user must use the
screws provided along with the product.
Also, be ensure
that they are firmly installed and prevent any
connection screw from loosening situation.
4.2.4 Electrical Connection
FF UAV electrical connection is simple and reliable.
The electrical interface is mainly concentrated on both sides of the wing.
As shown below, from top to bottom, they were airspeed interface, control
signal interface and power interface respectively.
Connect the two side wing cable plugs to the specified cable side connector on
the corresponding side of the fuselage with the correct polarity.
Installed the battery in the appropriate installation position, and firmly fixed,
where they cannot experience any loosening situation. Also, the user can
connect the batteries according to their situations.
www.armour.gr
Содержание FF VTOL
Страница 1: ...www armour gr www armour gr GENERAL MANUAL...
Страница 2: ...Prohibitions Important Caution Prompt Skills Annotations 1 Symbols in the Manual 2 www armour gr Tips...
Страница 9: ...4 2 1 Body Centre Wing Assembly 9 www armour gr...
Страница 13: ...13 3 Wing Assembly Make sure the lock pin are firmly locked www armour gr...
Страница 15: ...15 Make sure all screws are firmly installed www armour gr...
Страница 25: ...www armour gr www armour gr...