PRE-START CHECK LIST

UNIT INSTALLATION AND CONNECTIONS

Check that equipment is fully installed in accordance with the installation instructions

Visually check that air flows will not be obstructed

ELECTRICAL

Visually check all field wiring

Tighten all electrical connections including all factory wiring connections

Ensure supply cable is correct size

Check the required supply voltage is available on all phases

Check overload settings are correct (if applicable)

FILTERS

Check that both the fresh air and return air have adequate filters before starting unit

STARTING UNIT

Check Fans and Air Flows

Turn on all circuit breakers

Make sure all dampers are open 

Turn on control circuit and activate fans

Turn on supply fan, run and conduct an air balance (Fans do not require phase rotation)

Turn on exhaust fan, run and conduct an air balance 

Check fan current draw for each fan individually

8

Содержание XEM 500

Страница 1: ...XEMINSTALLATION OPERATIONMANUAL XCHANGEERV EXTERNALMOUNT XEM500 XEM900 XEM1200 XEM1700 XEM2000 XEM2500 XEM3500 XEM4500 XEM5000 XEM6000 XEM7000 XEM8000 ...

Страница 2: ......

Страница 3: ...ge media are available Every proposed installation must be subject to an engineered design by a mechanical services consultant Armcor Air Solutions is not responsible for performance of equipment in applications for which the equipment was not designed or specified Only trained and qualified personnel should install repair or service heat recovery and or air handling equipment Installing and servi...

Страница 4: ...e pad to be used under the base frame and flexible couplings be fitted to the supply and return ducts to reduce any vibration transfer The location of the fresh air inlets must adhere to the Australian Standards 1668 2 The fresh air intake should be positioned clear of any objects which could obstruct the airflow and be a minimum distance of 6 metres from any exhaust discharge ducts from this unit...

Страница 5: ...NOTE All units should be lifted into position using SLINGS and not CHAINS Chains may damage exterior finish on the fan unit Where units have to be craned into position installers must check unit weight is within the safe tolerance of the working capacity of the crane Prepare for lifting with spreaders as you would do with lifting air conditioning equipment When lifting equipment never stand under ...

Страница 6: ...construction and commissioning Where a Heat Exchanger is incorporated in the equipment warranty is void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE RETURN AND FRESH AIR INTAKES The power requirement and voltage are detailed on the equipment technical specifications available on our website www armcor com au and are on the identification serial no plate at...

Страница 7: ...ailable for units fitted with Certrifugal Fans OPTION 1 AND 2 DO NOT REQUIRE ANY CHANGES TO THE FAN POSITIONS INSIDE THE UNIT RETURN AIR Air that is drawn from conditioned area EXHAUST AIR Ducted to outside the building or into the roof space if adequate ventilation is available FRESH AIR Use a fresh air cowl or grill to introduce fresh air SUPPLY AIR Connect to the Airconditioning system or direc...

Страница 8: ...eaned once a month and the filter media should be replaced every 12 months Repeat the monthly schedule Check blower wheels for dirt build up and tightness on shaft Check all cabinet panels for correct fitting alignment and seals and clean cabinets as required Ensure no insulation has been detached from the panels All electrical terminals should be checked for tightness IMPORTANT Ensure the with ma...

Страница 9: ... and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pipe run between units the condensation drainpipe or other accessories Any warranty work performed by Armcor Air Solutions outside of Melbourne metro area will require the installing contractor to provide free of charge Oxy Acetylene Equipment Dry Nitrogen Vacuum Pump Refrig...

Страница 10: ...ons Ensure supply cable is correct size Check the required supply voltage is available on all phases Check overload settings are correct if applicable FILTERS Check that both the fresh air and return air have adequate filters before starting unit STARTING UNIT Check Fans and Air Flows Turn on all circuit breakers Make sure all dampers are open Turn on control circuit and activate fans Turn on supp...

Страница 11: ...rn Air Flow Total of all inlets L s Total System external resistance Pa Measured downstream of fan outlets plus upstream of Coil s Estimate of Fresh Air Make Up or L s ELECTRICAL Supply Voltage Supply Unit Fan Motor Amps Exhaust Fan Motor Amps Total Unit Amps Thermostat Settings ºC Thermostat Operating Correctly Y N Contactors Relays Operating Correctly Y N All Terminals Checked for Tightness and ...

Отзывы: