XEP Installation Manual

8

Ductwork

 

 Air distribution ductwork must be designed to allow for the specified air flow without 
excessive pressure levels. The unit should be situated as close as possible to the point 
of use to prevent unnecessary long runs of ductwork.

 

 Sheetmetal ductwork is recommended for use with all Armcor Air Solutions equipment.

 

Ducts should be insulated in accordance with 

BCA Section J-5

.

 

 Fan inlet conditions can affect the fan performance, particularly where duct bends 
cause a non-uniform flow and swirl at the inlet. To reduce losses due to fan systems 
effect, adequate length of straight duct between any elbow and the fan inlet should  
be provided or turning vanes used in the elbow.

 

 Poor fan outlet conditions will also affect the fan performance. We recommend a 
minimum of 1000mm of straight duct directly after the fan outlet.

Filters

 

50mm panel filters are a minimum recommendation for all equipment.

 

 Filters must be fitted to fresh air and/or return air. Where there is no provision  
for filters within the unit, the installing contractor is responsible to incorporate filters  
in the ductwork system external to the unit.

 

 It is recommended that temporary disposable filters are used during construction 
and commissioning.

 

 Where a Heat Exchanger is incorporated in the equipment, warranty is void if filters  
are not fitted. 

 

 IMPORTANT: NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE  
RETURN AND FRESH AIR INTAKES.

Electrical Requirements

 

 The power requirement and voltage are detailed on the equipment technical 
specifications (available on our website

 www.armcor.com.au

) and are on the 

identification/serial no. plate attached to each unit. 

 

 An electrical diagram is attached to the electrical box on the unit.

5.1

5.2

5.3

5.

Equipment 

Connections

/ 5. Equipment Connections

Содержание AHU 25000

Страница 1: ...Armcor XEP Installation Manual 1 XEP Packaged Airconditioning Unit XEP 500 XEP 8000 Installation and Operation Manual...

Страница 2: ...onfiguration suits external rooftop or ground level applications and include energy saving EC Plug Fans and the option of enthalpy or sensible heat exchange media Every proposed installation must be s...

Страница 3: ...lified personnel should install repair or service heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When worki...

Страница 4: ...le 800mm clearance for electrical connections 1200mm for all access doors on the unit or if no access door is provided 1200mm from the front of the unit Every proposed installation must be subject to...

Страница 5: ...any openable windows Drainage Equipment should be installed with a positive fall to ensure water drains away freely through drain outlets Drain lines must be as large as or larger than the fitting to...

Страница 6: ...PPARENT DO NOT LIFT UNIT ON TO SITE WITHOUT PRIOR APPROVAL FROM ARMCOR The unit was tested and inspected prior to packing and was in perfect condition at the time at time of despatch Check unit rating...

Страница 7: ...nditions Only lift when weather conditions are favourable Lifting with a Forklift Exercise extreme caution when lifting with a forklift Do not exceed the height limit of the forklift and never allow t...

Страница 8: ...mum of 1000mm of straight duct directly after the fan outlet Filters 50mm panel filters are a minimum recommendation for all equipment Filters must be fitted to fresh air and or return air Where there...

Страница 9: ...breaker mounted back at the distribution board to provide local isolation during service and maintenance periods Main cables and control circuit wires are to be connected as per wiring diagram All wi...

Страница 10: ...pply Air Exhaust Condensor Air Return Air Fresh Air Return Air Air that is drawn from conditioned area Exhaust Air Air discharged to outdoors Fresh Air Use a fresh air cowl or grill to introduce fresh...

Страница 11: ...visible during operation after the unit has stabilised Sight Glass Sight glass is not necessarily clear Do not charge on sight glass with reverse cycle systems Digital Compressor Control Board TX Valv...

Страница 12: ...trapped externally to the unit Compressor Bracket Do not remove compressor bracket this bracket is for transport and for the operation of the compressor Electrical Connection Tighten all electrical co...

Страница 13: ...ly Maintenance Schedules Monthly maintenance is usually focused on air filters and visual checks to monitor any operational deficiencies The type of filter and frequency of cleaning should be addresse...

Страница 14: ...be checked for tightness IMPORTANT Ensure the with main switch is turned off Check and clean heat exchangers heating cooling coils drain trays and outlets If applicable Vacuum or brush clean as necess...

Страница 15: ...ication abuse alteration tampering or servicing by anyone other than an authorized person Damage resulting from incorrect installation commissioning or use other than in accordance with the installati...

Страница 16: ...nal items Regular service has not been carried out by an appropriate Armcor approved licenced installer The unit is used other than for the heating and cooling of air for human comfort unless approved...

Страница 17: ...is not rubbing against other pipes due to movement during transport Leak test all caps and pressure connections after commissioning Starting Unit Check Fans and Air Flows Turn on all circuit breakers...

Страница 18: ...e with published Compressor Amps Outdoor Fan Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Opera...

Страница 19: ...Fresh Air Indoors For more information W armcor com au E sales armcor com au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047...

Отзывы: