ARITERM SWEDEN AB
Installation, Operation & Maintenance -
2009.02.18- 7/20
MOUNTING OF DOCKNING PLATE AND SERVICE RAIL
Mount the secondary air tube, service rail and quick-release hand hold as shown in the photo-
graph.
Use the door frame as a template for drilling the four holes for the boiler’s
stud bolts in the docking plate. In some cases, the docking plate’s outer di-
mension must be adapted to fit the boiler. It is easiest to use a circular saw.
Mount the plate against the boiler frame with heat-resistence glass fibre
reinforced sealing strip or furnace cement, which can easily be applied
afterwards through the mounting plate opening. Tighten while making sure
the plate is not deformed. Final tightening of the service rail is to be done
only once the burner has been attached and secured to the mounting plate.
The service rail is to be pressed up against the boilers guide pins and outer
clamping bolts are to be securely tightened. Check that the burner is cent-
red on the mounting plate’s guide pins when it is pulled out and pushed in.
It is a good idea to lubricate the guide arms.
2
3
4
1
Mounting plate
1.
Quick-release hand hold
2.
Packing
3.
Service rail
4.
Secondary air tube
5.
5
2
The fully assembled
mounting plate and
service rail.
The service rail should be loosely installed on the
mounting plate and secured only after the burner
is in place.
Electric cables should be installed such that they
must be disconnected before the burne can be
withdrawn from the boiler.