![Arista 7500N Series Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/arista/7500n-series/7500n-series_quick-start-manual_2970772027.webp)
Chapter 3: Rack Mounting the Switch
7512N and 7516N Shelf Rack Mount Installation
Quick Start Guide: 7500N Series Modular Switches
21
Figure 3-13: Left rear post assembly and shelf support orientation
Step 6
Lift the shelf above the shelf supports installed on the left and right rack posts (step 2 and
step 3). Align the holes and hook with the stubs on the brackets. Lower the shelf such that the
shelf-support-bracket stubs are inserted into the shelf holes and hook (
).
Step 7
Rear: Fasten screws to all holes
•
Front: Fasten screws only where indicated with arrows (2x).
•
Rear: Fasten screws to all holes.
1
Install all four screws in the back
Содержание 7500N Series
Страница 6: ...vi 9 March 2020Quick Start Guide 7500N Series Modular Switches ...
Страница 54: ...48 Quick Start Guide 7500N Series Modular Switches Power Supply Status Indicators Appendix A Status Indicators ...
Страница 78: ...72 Quick Start Guide 7500N Series Modular Switches Appendix E Line Cards ...
Страница 86: ...80 Quick Start Guide 7500N Series Modular Switches Linecards Appendix F Maintenance and Field Replacement ...
Страница 88: ...82 Quick Start Guide 7500N Series Modular Switches Appendix G Taiwan RoHS Information ...