![Arista 7500N Series Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/arista/7500n-series/7500n-series_quick-start-manual_2970772025.webp)
Chapter 3: Rack Mounting the Switch
7512N and 7516N Shelf Rack Mount Installation
Quick Start Guide: 7500N Series Modular Switches
19
.lists the cage nut locations for the switches on the rack front and rear.
Step 2
Attach the front bracket of the shelf support to the left front rack post, as shown in
An up arrow is printed on the shelf support to indicate its proper orientation.
Unthreaded rack holes:
Use the M6 screws and cage nuts supplied in the accessory kit.
Threaded rack holes:
Attach the front bracket to the post with screws that can be threaded
through the rack post.
Step 3
Hook the alignment pin to the bottom hole of the 6th U from bottom (
Table 3-1 Cage nut locations on rack
Switch
Cage Nut Locations
7512N
(Front of the rack)
Top hole 1st U
Middle hole 2nd U
Middle hole 4th U
Bottom hole 5th U
Top hole 9th U
Middle hole 15th U
Middle hole 17th U
7516N
(Front of the rack)
Top hole 1st U
Middle hole 2nd U
Middle hole 4th U
Bottom hole 5th U
Top hole 13th U
Top hole 16th U
Bottom hole 26th U
Top hole 28th U
7512N and 7516N
(Rear of the rack)
Top hole 1st U
Middle hole 2nd U
Middle hole 4th U
Bottom hole 5th U
Содержание 7500N Series
Страница 6: ...vi 9 March 2020Quick Start Guide 7500N Series Modular Switches ...
Страница 54: ...48 Quick Start Guide 7500N Series Modular Switches Power Supply Status Indicators Appendix A Status Indicators ...
Страница 78: ...72 Quick Start Guide 7500N Series Modular Switches Appendix E Line Cards ...
Страница 86: ...80 Quick Start Guide 7500N Series Modular Switches Linecards Appendix F Maintenance and Field Replacement ...
Страница 88: ...82 Quick Start Guide 7500N Series Modular Switches Appendix G Taiwan RoHS Information ...