![Arista 7500 Series Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/arista/7500-series/7500-series_quick-start-manual_2970771006.webp)
6
Arista Networks
Copyright 2015
Chapter 2: Preparation
2.2
Tools Required for Installation
The following tools are required to install a modular switch:
• Mechanical device capable of lifting chassis being installed (
).
• Adjustable wrench (provided)
• Phillips #2 screwdriver
• Phillips #3 screwdriver
Two-post rack mounts:
• Eight equipment rack screws (all two-post rack mounts).
• Eight equipment rack nuts (two-post rack mount with unthreaded rack post holes).
Four-port rack mounts:
• Eight equipment rack screws (four-post rack mount with threaded rack post holes).
Accessory kit provides rack screws for four-post rack mount with unthreaded rack post holes.
The accessory kit includes screws that fit many common equipment racks.
2.3
Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the switch.
• Assemble or disassemble equipment only in a static-free work area.
• Use a conductive work surfaces (such as an antistatic mat) to dissipate static charge.
• Wear an ESD wrist strap to dissipate static charge accumulation.
• Minimize handling of assemblies and components.
• Keep replacement parts in their original static-free packaging.
• Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
• Use tools that do not create ESD.