Chapter 1
Overview
Data centers demand high performance networking solutions. The Arista 7010T offers a purpose built
high performance and power efficient solution for high density data center deployments. The Arista
7010T series delivers line rate switching at Layer 2 and Layer 3 to enable simpler network designs
for data centers that lowers the network capital and operational expenses. When used in conjunction
with the Arista 7000 series of fixed and modular switches it allows networks to scale out in a high
performance two-tier network that provides predictable and consistent application performance.
The Overview section reviews the following topics:
•
•
Receiving and Inspecting the Equipment
•
•
Obtaining Technical Assistance
•
1.1
Scope
This guide is intended for properly trained service personnel and technicians who need to install the
following Arista Networks Data Center Switches:
DCS-7010T-48
DCS-7010T-48-DC
DCS-7010TX-48
DCS-7010TX-48-DC
Important:
Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2
Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain
packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect
them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
your purchase order.
provides a list of components included with the switch.
1.3
Installation Process
Tasks required to install and use the switch.
The following tasks are required to install and use the switch:
1. Select and prepare the installation site (