7
5.
Cut holes at marked locations for duct and electrical wiring.
Mounting the hood
1.
Drive a mounting screw (from the hardware package) partway
into each center of the narrow neck of the keyhole slots
marked on the cabinet bottom or the wall’s support frame.
NOTE:
You should consider the wall’s construction material in
order to choose the right wall anchor and screw. For plywood
walls you should use the 10x60 mm wall anchors and the
5.4x75 mm screws. For concrete walls you should use the
5x45 mm screws.
2.
Install the 2 pieces of the selected screws on the mountings
screws location (see the image). Leave a
1
⁄
4
” (6.4 mm) gap
between the wall and the back of the screw head to slide
range hood into place.
1
⁄
4
”
(6.4 mm)
3.
Fix the wiring conduit of the hood.
4.
Slide the hood back against the wall. Tighten the mounting
screws. Be sure the screw heads are in the narrow neck of the
keyhole slot.
A
B
A. Mounting Screws
B. Lower security screws (Wall Installation)
5.
Drive 2 pieces of the selected screws in the lower security
screws location (see the image above).
6.
Connect Ductwork to hood.
Cabinet Installation
NOTE:
Your cabinet must be able to support at least 88 lb (40 kg).
1.
Drive a mounting screw (from the hardware package) partway
into each center of the narrow neck of the keyhole slots
marked on the cabinet bottom or the wall’s support frame.
2.
Install the 4 - 4 x 8 mm mounting screws. Leave a 1⁄4” (6.4
mm) gap between the wall and the back of the screw
head to slide range hood into place.
1
⁄
4
”
(6.4 mm)
3.
Fix the wiring conduit of the hood.
4.
Slide the hood back against the cabinet. Tighten the mounting
screws. Be sure the screw heads are in the narrow neck of the
keyhole slot.
A
A. Mounting Screws