background image

R-20 SM 

 

 

 

 

 

 

 

 
 

Before returning to regular operation 

1.

 

Re-assemble any protection covers or protection mechanisms removed during service or maintenance operations. 

2.

 

Make sure that all the tools, ladders, lifting devices, etc. used during the maintenance procedures are taken away 
from the product area and stored. 

3.

 

Remove grease and fat material residues in order to avoid slipping. 

4.

 

In order to return the product to regular operation, follow the First Start-up Operation instructions as detailed in 
your user manual. 

 

Содержание Eliptix R-20-SM 3W

Страница 1: ...transmission and waterworks systems for irrigation landscape and infrastructure applications The R 20 series has an innovative elliptic shaped diaphragm that integrates well with a wide variety of reg...

Страница 2: ...peration 6 2 INSTALLATION 7 2 1 Pre installation requisites 7 2 2 Installation procedure 8 2 3 Initial Start up The Control Valve 9 2 4 Initial Set up The Pressure Reducing Application 10 3 OPERATION...

Страница 3: ...ever whether caused by accessing and or relying upon this Disclaimer and or in any document enclosed hereto including without limitation any links procedures or materials A R I shall NOT assume any li...

Страница 4: ...prior warning Make sure that allproducts outlet portsarenotdirectedtowardelectricalelements pumps orpeople 8 Always open and close valves slowly and gradually 9 Please note that the maximum working pr...

Страница 5: ...lations set for handling this type of fluid 3 Before disconnecting the product from the system and before releasing the residual pressure do NOT loosen or unscrew the product bolts removeanyprotection...

Страница 6: ...ns 2 Make sure that all the tools ladders lifting devices etc used during the maintenance procedures are taken away from the product area and stored 3 Remove grease and fat material residues in order...

Страница 7: ...2 Before installing the valve flush the pipeline to remove scale dirt and other particles that might affect the valve performance 3 Carefully remove the valve from the shipping package Unload all valv...

Страница 8: ...wing valves Isolation valves upstream and downstream of the control valve 2 2A Air valves upstream and downstream of the control valve 5 3 Turn the 3 way selector 3 to its CLOSE position and turn on t...

Страница 9: ...solation valve 2A 6 Turn adjusting screw 4B counter clockwise one turn at a time allowing sometime between turns for the valve to respond until the upstream pressure reaches the required level water s...

Страница 10: ...the pilot decreases the internal pressure of the control chamber by releasing water out to the atmosphere through port 4 causing the valve s diaphragm to slightly open and decrease the upstream pressu...

Страница 11: ...is reached 8 To decrease upstream pressure turn the adjusting bolt 4B counterclockwise one turn at a time allowing sometime between turns for the valve to respond Downstream pressure is shown on the...

Страница 12: ...ally inspect the valve s diaphragm for any tears 2 Every 12 months inspect the valve s operation and clean the Finger Filter 3 Check the downstream pressure adjust if required 4 2 Storing the valve It...

Страница 13: ...ector 3 to open for 5 seconds and then to close If the problem continues turn off the water supply to the valve Remove the bonnet and diaphragm remove the foreign object and check that the diaphragm b...

Страница 14: ...R 20 SM 6 DIMENSIONAL DRAWING...

Страница 15: ...le nor does this warranty extended to any consequential or incidental damages or expenses of any kind or nature regardless of the nature thereof including without limitation injury to persons or prope...

Отзывы: