4
Assembly Instructions
9
Step
13
Prepare the right side
Screw 4 large metal
dowels into the holes
shown on the right side
. .
Push 2 hollow core
locking nuts into the
right side , making
sure that they are flush
against the panel’s
surface.
Using a hammer, tap in
the pin on the hollow
core locking nut .
Note:
The pin should be
tapped in flush with the
top surface of the hollow
core locking nut .
B
C
C
B
B
B
2
B
2
2
C
C
C
Step
10
G
C
B
Join the left side and
top
Push the left side
onto the top .
The 2 small metal dowels
. fitted to the top
must slide into the top of
the 2 hollow core locking
nuts fitted to the left
side .
Insert a screwdriver into
the 2 hollow core locking
nuts and turn the nuts
inside as far as they will
go.
1
1
4
G
4
C
1
C
b:
a:
Prepare the upright
a:
Fit runner to the
upright .
The 1st screw uses
the 2nd hole in from the
front of the runner.
The 2nd and 3rd screws
. use the holes that line
up with the other panel
holes.
b:
Fit a screw into
the 2nd hole in at the top
of the runner .
Screw 2 large metal
dowels into the
upright .
Gently tap 2 mini blocks
. into the holes on the
upright , orientated as
shown.
5
B
5
Join the top and
upright
Position the upright
so that the screws from
the mini blocks are
over the holes in the top
panel .
Tighten up the screws in
the 2 mini blocks into
the holes in the top .
Step
14
5
Front edge
O
O
5
O
4
O
4
M b
K
Fr
ont edge
K
1st
screw
2nd
screw
K
3rd
screw
M b
Fr
ont edge
J
K
K
M b
K
B
B
O
O
J
Front
edge
Front
edge
M b
5
K
K
J
M b
5
5
4