9
NITROGEN PRO 230A: 4. Stem/Handlebar Installation
1. Choose the desired stem length, bolt, and spacer
needed (refer to the Product Matrix chart on p.X) – note
that the bolt comes pre-coated with Loctite. In the event
of assembling and disassembling, one drop of blue
Loctite (#242 or #243) must be applied on the bolt
threads.