INSTALLATION MANUAL AND OPERATING INSTRUCTIONS
AZ-6CP Control Board
1.
Transformer - 75VA, 120V/24V 50 HZ
2.
Circuit Breaker Reset Switch
3.
Transformer Spade Terminals (120 Vac) (
Primary
)
4.
Transformer Spade Terminals (24 Vac) (
Class 2
)
5.
Isolated End Switch X-X
6.
Data Port Terminal - used for communication with the
Argo DPM-2 Outdoor Temperature Setback Control
7.
LED Array (
see “AZ-4CP Control Board” in this manual
for specifications
)
8.
Thermostat Terminals (
Class 2
)
9.
Green Indicator LED - indicates zone is calling for heat
10.
Field Selectable Option Dip Switches (see “Field
Selectable Option Switches” in this manual for
explanation)
11.
Red Indicator LED - indicates zone valve is fully open
12.
Zone Valve Terminals (
Class 2
)
13.
ZC on Green Indicator LED
14.
Priority Pump Terminals (
Primary
)
15.
ZR-ZC Terminals (used for tankless coil applications)
(
Primary
)
16.
Source Power Terminals (
Primary
)
17.
Primary Pump Terminals (
Primary
)
Mounting Instructions
Mount the Argo AZ-CP Zone Valve Control vertically
on a solid wall or partition. For your convenience it is
recommended that the control be mounted as close as
possible to the device to be controlled. The control should
never be mounted more than 75 feet away. Select a
location that is easily accessible for installation and service.
NOTE: To reduce the possible transformer hum and relay
noise that is sometimes amplified by mounting surfaces
such as sheet metal, plasterboard, and similar materials,
place rubber or felt washers between the case and the
mounting surface.
1.
Position the control and mark the mounting holes.
2.
Start screws (not provided) for the keyhole type
mounting holes in the upper corner(s). Tighten the
screws down to about ⅛” (3mm) from the surface.
3.
Hang the control on the screw(s), position the case,
and start the bottom screws.
4.
Tighten all screws.
7
PN 240005386 Rev. D [11/15/2021]