Argo AT062310B Скачать руководство пользователя страница 11

15

THErmosTAT insTALLATion

sTArTup And sEAsonAL mAinTEnAncE

!

  

CAUTION

Label all wires prior to disconnection when 

servicing controls. Wiring errors can cause 

improper and dangerous operation. Verify 

proper operation after service. 

Use qualified service agency for annual inspection of 

boiler and heating system.

Set boiler operating temperature to designed heating 

3. 

water temperature by adjusting potentiometer dial 

located on top center of controller (Figure 4

). 

Adjust 

arrow on temperature adjustment dial to water 

temperature required.

NOTICE

Boiler is equipped with high-limit temperature 

device set at 200° F as safety limit control. 

High limit temperature device has automatic 

reset function will reset at 170° F.

Turn on hydronic block circuit breaker at service 

4. 

entrance and/or disconnect switch, depending on 
option, and 15 amp circuit breaker on hydronic block.
Set one thermostat above room temperature. Circulator 

5. 

pump will now operate.
Check system again for leaks. Allow circulator pump to 

6. 

run until all air has been vented from system. gurgling 
or rushing sound indicates presence of air.
Hydronic block will start to produce heat. Listen for 

7. 

air passing through system as water temperature 
increases. Water pressure will rise somewhat as 
temperature increases - this is normal as long as the 
pressure remains less than 25 PSIg.

Hydronic block is now ready to be put into service

.

Verify hydronic block circuit breaker or switch at service 

1. 

entrance and, depending on option, hydronic block 

circuit breakers within unit are in "Off" position.

NOTICE

Only propylene glycol can be used in heating 

system to prevent freezing. Recommendation 

is maximum 40% or less propylene glycol 

mixture to ensure proper operation of electric 

boiler.

Fill heating system with water until pressure is 10-15 

2. 

PSIg. Check for leaks, repair if necessary, purge all air 

from system.

NOTICE

Failure to vent and keep air out of heating 

system will result in damage to heating ele-

ments in hydronic block. Damage of this type 

is not covered by manufacturer's warranty.

NotE: 

your Argo AT Boiler will work 

with  standard  and  programmable 

setback thermostats. 

Some  programmable  thermostats 

may  cause  boiler  control  T-T  LED 

to flicker on and off when there is 

no  call  for  heat,  your  thermostat 

will require an external 24V power 

supply (transformer) and isolation 

relay or Argo AR822 control.

1.  Install  thermostat  on  inside  wall  five  feet  above 

floor.

2. NEVER install thermostat on outside wall.

3. Do not install thermostat where it will be affected by 

sunlight, drafts, televisions, lighting fixtures, hot or 

cold pipes, fireplaces, or chimneys.

4.  Instructions  for  final  adjustment  of  thermostat 

(adjusting heating anticipator, calibration, etc.) are 

packaged with thermostat. 

Recommended setting 

for heating anticipator is 0.1 amps.

Содержание AT062310B

Страница 1: ...ting brackets for easy wall mounting Use of lag screws or anchor bolts through holes provided or on 3 4 plywood panel On uneven walls suggested mounting surface be provided such as two 2 x 4 s Surface...

Страница 2: ...p supply may be located in this area below Circulator pump should be installed on supply side pumping away 6 Install gate valves at locations shown in Figures 2 3 so any boiler servicing requiring rem...

Страница 3: ...7 primary secondary piping for Multiple zoning with ZONE VALVES primary secondary piping for Multiple zoning with circulators PRIMary secondary piping figure 2 figure 3...

Страница 4: ...e ends before inserting into terminal block Tighten terminal screws Do not use pump rated greater than 5 amps Thermostat Connect thermostat or zone valve end switch to terminals TT and TT Figure 4 Do...

Страница 5: ...re sizes specified conform to Canadian Electrical Code Canada or National Electric Code USA and include derating for ampacity and temperature Use copper wire only Check state and local requirements Re...

Страница 6: ...or will continue to be energized for 3 minutes to purge boiler After 3 minutes control will de energize circulator Circ LED turns off If during start up or during operation safety end switch opens its...

Страница 7: ...TACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD WIRING POSE DES C BLES 120 VOLT SUR EN CHANTIER 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT...

Страница 8: ...HERS SOURCE DU COURANT 120V 60HZ 1PH OU AUTRES OPTIONAL FLOW SWITCH BY OTHERS INTERRUPTEUR DE D BIT FACULTATIF OU AUTRES THERMOSTAT BY OTHERS THERMOSTAT OU AUTRES ELEMENT 1 L MENT No1 ELEMENT 1 RELAYS...

Страница 9: ...T BLK BLANC NOIR WHT BLANC FUSE BLOCK BLOC DE FUSIBLE BLK NOIR L2 L1 POWER BLOCK BLOC DE PUISSANCE 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT EN CHANTIER EN CHANTIER 120 VOLT WIRING POSE DES C BLE...

Страница 10: ...NOIR WHT BLANC RED ROUGE WIRE LEGEND L GENDE DES FILS DRY CONTACT WIRING POSE DES C BLES DE CONTACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD...

Страница 11: ...as the pressure remains less than 25 PSIG Hydronic block is now ready to be put into service Verify hydronic block circuit breaker or switch at service 1 entrance and depending on option hydronic blo...

Страница 12: ...cluded with this manual Turn off hydronic unit circuit breaker at service en 1 trance and or disconnect switch Close gate valves near inlet and outlet of hydronic 2 block noisy boiler heating element...