
EN
7
7
• Deoxidized annealed copper tube for refrigerant tubing connecting Emix; it has to be insulated with foamed
polyethylene (min. thickness 8mm).
• Anti-freeze oil for flare connections (about 30g.)
• Electric wire: use insulated copper wires of size and length as shown at paragraph “SYSTEM WIRING DIAGRAMS”.
• Tubes for water.
2.3 - ADDITIONAL MATERIAL REQUIRED FOR INSTALLATION (NOT SUPPLIED)
1. Standard screwdriver
2. Phillips head screwdriver
3. Knife or wire stripper
4. Tape measure
5. Level
6. Sabre saw or key hole saw
7. Hacksaw
8. Core bits ø 5
1
9. Hammer
10. Drill
11. Tube cutter
12. Tube flaring tool
13. Torque wrench
14. Adjustable wrench
15. Reamer (for
reburring)
16. Hex. key
Tools required for installation (not supplied)
3 - INSTALLAZIONE
3.1 - INSTALLATION LOCATION
The unit must be installed in a closed location.
AVOID
• Proximity to heat sources, exhaust fans.
• Proximity to combustible materials.
• Direct sunlight.
• Locations where the unit could be splashed with
water or affected by dampness or humidity (i.e. in
laundries).
• Unsteady locations that will cause noise or possible
waterleakage.
• To make holes in areas where electrical wiring or
conduits are located.
IMPORTANT NOTES
• Select a sufficiently strong location/wall to support
the weight of the unit.
• Leave a minimum operation and maintenance area
around the unit.(See figure).
60 cm
60 cm
20 cm