
Low Rate High Rate
Elevator 15 degrees 45-50 degrees
Rudder 25 degrees 40-45 degrees
Ailerons 25 degrees 35-40 degrees
FINAL ASSEMBLY AND PRE-FLIGHT INSPECTIONS
1. Before arriving at your flying field, be sure all your batteries are properly charged
and all radio systems are in proper working order.
2. Install the wings onto the fuselage being careful to align the wing tube with the
wings and not force it. The wing tube may be initially tight but will loosen some
with use. Guide your servo wires into the fuselage openings and connect to the
proper aileron channels. Servo clips are recommended. Once you have the wings
fully seated in the fuselage tighten the wing bolts inside the fuselage.
3.
Side force generators Assembly.
Cut the wing film needed to be instal the SFG. Fixed the SFG Use M3X12 Hexagon
socket screw & washer & Self-locking nut.
Содержание SBACH300 20CC V2
Страница 6: ...Flat nylon hinges for better flying strength High quality 2 5mm ball links assemblys ...
Страница 9: ...Canopy quick release mechanism ...
Страница 10: ...It can also be powered by gas engine ...
Страница 11: ...Scheme A white red black ...
Страница 12: ...Scheme B white red blue ...
Страница 13: ......
Страница 17: ...Make sure to sand the horns to keep its strength ...
Страница 34: ...5 Fix the battery with Velcro 6 The following pictures show how to install gas engine ...
Страница 39: ...Wingbag for 20CC Not Included ...
Страница 40: ...3in C F Spinner with Alu base for electric Not Included ...
Страница 41: ...3in C F spinner for Nitro Gas Not Included ...
Страница 42: ......