66
KC232A
KC149A
12. Install the heat shield; then install the gas tank (see
Fuel/Lubrication/Cooling).
13. Install the front body panel, front rack, and footwells
(see Steering/Frame).
14. Pour the appropriate quantity and grade oil into the
crankcase; then connect the negative battery cable
and move the ATV outside to a well ventilated area.
15. Start the engine and allow the engine to warm up
while checking for oil leaks; then shut the engine off
and check the oil level. Add oil as required.
Manual
Table of Contents
Содержание 2012 350 HS
Страница 22: ...21 KC149A Manual Table of Contents ...