HARDWARE INSTALLATION GUIDE
Arcserve
UDP
8300 and
8400
Appliance Hardware Installation Guide
Страница 1: ...HARDWARE INSTALLATION GUIDE Arcserve UDP 8300 and UDP 8400 Appliance Hardware Installation Guide ...
Страница 2: ...ack Installation square holes 8 Section 6B 4 Post Rack Installation round holes 9 Section 7 Rail Installation on the Appliance 10 Section 8 Installing the Appliance in the Rack 11 Section 9 Rear Panel Connections 12 Section 10 Front Panel Connections 14 Section 11 Bezel Installation on the Appliance 15 Section 12 Run Arcserve UDP Appliance Wizard 15 Section 13 Access Arcserve UDP 16 Section 14 Con...
Страница 3: ...s product may cause radio interference in which case the user may be required to take adequate measures VCCI Warning This is a product of VCCI Class A Compliance Environmental Warning Perchlorate Material special handling may apply See www dtsc ca gov hazardouswaste perchlorate This notice is required by California Code of Regulations Title 22 Division 4 5 Chapter 33 Best Management Practices for ...
Страница 4: ...ceptacle on the power supply must be an IEC 320 sheet C13 type female connector n Plug the power cord s into a socket that is properly grounded before turning on the power CAUTION Required operating conditions for the appliance are n Temperature 10 to 35o C n Humidity non condensing 8 to 90 CAUTION CLASS 1 LASER PRODUCT APPAREIL À LASER DE CLASSE 1 DISPOSING OF BATTERY BACKUP UNITS IF APPLICABLE W...
Страница 5: ...pment to avoid possible electrical shock n Use rubber mats specifically designed as electrical insulators when working with computer systems n The power supply or power cord must include a grounding plug and must be plugged into grounded outlets CAUTION Electric Static Discharge ESD can damage electronic components To prevent damage to your system board it is important to handle it very carefully ...
Страница 6: ...KS MUST BE MOUNTED SECURELY Ensure that all leveling jacks or stabilizers are properly attached to the rack If installing multiple appliances in a rack make sure the overall loading for each branch circuit does not exceed the rated capacity Do not slide more than one appliance out from the rack at a time Extending more than one appliance at a time may result in the rack becoming unstable Install y...
Страница 7: ... cone washers Four Round to square hole converter brackets Two M5 x 20 Philips truss head screws Eight M5 x 12 Philips flat head screws NOTE Use the hardware supplied with your specific rack if different from the hardware supplied in this kit INSTALLATION HARDWARE ALTERNATE INSTALLATION HARDWARE Round Hole rack Sliding rack rail part of quick rail assembly Adjustable fixed quick rail assembly atta...
Страница 8: ...e the two adjustable standard rack rail assemblies n Remove the inner fixed chassis rails from the adjustable quick rail assemblies n Pull each inner fixed chassis rail out as far as possible Press the locking tab down to pull the chassis rails completely out n Put these rails aside for later installation on the appliance NOTE The installation procedures for 6A 4 Post Rack below are for use with t...
Страница 9: ...bly hooks for the first quick rail as shown in the detail drawing below with the hook facing down through the openings in the square hole converter bracket The release tabs secure the rails in place D Pull the adjustable rail assembly backward toward the back of the rack The back section extends to adjust to the proper rack depth E Insert the back end of quick rail assembly hooks with the hooks fa...
Страница 10: ...ated 2 1 CAUTION The chassi s is heavy The installa tion proced ure require s minim um of 2 people R Rev B Need Rev B inner rail One M4 x 6 screw on each side UDP 8300 8300 seated fully until rail d inner mi e h t o t n i l i a r d the Aim 2 with thumb rail chassis midd e th ward Press to il ra e l d h the e a 1 2 1 es minim um of 2 people m of chassi s llat The installa tion proced ur equir nstal...
Страница 11: ...TION The chassis is heavy The installati on procedu re requires minimum of 2 people R Rev B Need Rev B inner rail UDP 8300 on each side truss head screw One M5 x 20 Phillips 8300 UDP 8 Installing the Appliance in the Rack Step 1 n While supporting the appliance on the bottom carefully align the back end of the fixed chassis rails on the appliance with the fixed adjustable rack rail assemblies prev...
Страница 12: ...t Slot 4 Full Height PCIe Expansion Slot Power Supply Module 1 Lock Power Supply Module 1 Power Good LED Power Supply Module 1 AC Receptacle Power Supply Module 1 Fan Rear SSDs optional IPMI Port Remote Management Slot 5 External SAS 9200 8e HBA Ports Slot 6 Quad Port NIC Card Slot 7 Low Profile PCIe Expansion Slot Slot 1 LSI 9361 8i RAID Controller Card Slot 2 Full Height PCIe Expansion Slot Powe...
Страница 13: ...e server turn off the server by pressing the power button and unplug the AC power cord from the server or wall outlet NOTE The server offers redundant hot swap capability The connections to AC mains should be made in a manner appropriate to local code and consistent with customer power distribution with or without redundant sources 9 Rear Panel Connections continued Power Supply Condition On the r...
Страница 14: ...ngestion Fan failure check for inoperative fan Power failure check for a non operational power supply Local UID has been activated Use this function to locate the server in a rack mount environment Remote UID is on Use this function to identify the server from a remote location Status Continuously on and red Blinking red 1Hz Blinking red 0 25 Hz Solid Blue Blinking Blue Power Button Press the powe...
Страница 15: ...s initially applied to the appliance the Arcserve UDP Appliance Wizard is launched Navigate through each page of the wizard For more information about the wizard see the Arcserve UDP Appliance User Guide arcserve com udp appliance userguide or view the video at arcserve com udp appliance wizard video Note After selecting the Operating System language a screen to enter Windows license may come up S...
Страница 16: ...es such as Windows Linux and virtual machines on VMware ESX servers or Microsoft Hyper V servers You can back up data to either a local machine or a recovery point server A recovery point server is a central server where backups from multiple sources are stored and can be globally deduplicated For more information about Arcserve UDP see the Knowledge Center at arcserve com udp knowledge center Arc...