FFLB User Manual 200214 Page 7 of 8
3.2
PROCESS FLOW
3.3 SHUTDOWN
1.
Turn off all the step control switches.
2.
Turn off the Circuit Breaker.
3.
Turn off the Auxiliary Supply.
Start
Connect the Auxiliary
Power 230V AC or 115V AC
to Load unit
Connect the Test supply to
Load output (P & N)
Terminals
ON
?
Check Power
Connection &
Fuse
Observe
FAULT
Indicator
Y
N
N
ON?
Consult
Troubleshooting
Guide 4.2
Y
Observe the MASTER
LOAD indicator and Fans
Shutdown
Turn on Aux Power switch
& Circuit breaker
Testing
Enable the Desired load
steps