background image

01945 410950 

[email protected]

 

http://www.arborgardensolutions.co.uk

 

Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 5 

Step 6 

Step 7 

Step 8 

Now take the front bar and secure it with the 

60mm screws as shown in the picture. Please don’t 

forget to use the space bar (70cm) between the 
posts to ensure that the gap is correct. 

Carefully lay the assembly on its back and position 
the metal bar as shown across the bottom of the 
front posts. Use spacing block (70cm) on both slots 
as shown to ensure the gap is the right size. 

Place the roof batten section onto the store and 
align with the edges of the posts. Secure with 
provided 85mm screws. 

Place the roofs sections onto the store and align to 
the rear batten. 

Please note: One lid out of three is 

smaller. Make sure it is fixed on a middle section.

 

Отзывы: