![Aquatron 400 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/aquatron/400/400_user-manual_2961977004.webp)
May 2007
4
2. UNPACKING
The following parts are delivered: Separator, Bio Chamber 90 or 400, connecting pipes and – provided the UV
unit is included in the delivery – a UV unit and a Waterseal to be attached to the UV unit. For pitch changes of
the 110 mm inlet pipe, a special angled coupler double socket is provided. A mosquito net for the top of the
vent pipe is also being included.
3. PREPARATIONS
To install the AQUATRON toilet system you will need the following material in addition to the WC. Items
marked with an asterisk (*) are included in the delivery, the other items to be purchased locally if needed.
PIPES:
WC – Separator
4”
x
90
o
Soil pipe bend socket
4” Coupler
double
socket
4”
x
#
” x 45
o
Soil pipe single branch for 3-4”
(=
#
) vent pipes
4” Angled coupler double socket (*)
For 4% change of inlet pipe pitch
4” pipes as needed
Inlet pipe
Separator – Bio Chamber
2" Connecting Pipe (*)
Angled and specially made for
Aquatron 90 and 400 respectively;
coupler sockets at both ends
Bio Chamber – UV unit
2" x 500 mm (*)
Pipe with coupler socket
2"
x
90
o
(*)
Coupler single socket 90
o
bend
UV unit – Grey Water sewage
Waterseal (*)
For the UV unit outlet
2” Coupler double socket
For Grey Water sewage attachment
2” pipes as needed
Outlet pipe to Grey Water sewage
MISCELLANEOUS
:
Course bark grinds, see Item 7.3:
(purchase separately)
-
for
Aquatron
90, 1 sack (approx 50 liters);
-
for
Aquatron
400, 2 sacks.
Grounded 230 V outlet for the UV unit.
Insulation board, 2” thickness.
Material for platform and consoles.
45
o
bend to be installed at inlet in the UV unit if a pump is installed
between Bio Chamber and UV unit, see Item 6.1.
3-4" pipe and coupler sockets for vent pipe (WC ventilation),
4.
INSTALLATION OF THE AQUATRON SYSTEM
4.1 Arrangement of the Bio Chamber
4.1.1 Build a platform for the Bio Chamber. Position a 2” (50 mm) insulation board on top of the platform.
For measurements see Figure 1 (Aquatron 90) and Figure 2 (Aquatron 400). Put the Bio Chamber
steadily on the platform.
4.1.2 Check the compartment where the system is to be installed. If low pressure occurs (e g if an oil-
burner is installed), a separate room must be built for the Bio Chamber. The compartement must
have a ventilator to the outside air and the door should be sealed by a strip seal.
4.1.3 The Aquatron system should be installed in a frost free compartement where:
- an optimal composting temperature is minimum 12
°
C (55
°
F),
- at year-round living or vermi composting a temperature above 15
°
C (60
°
F) is recommended,
- if necessary, insulate the compartment and install a thermostat controlled electric heater.
If the system is installed in a vacation house which is closed during the winter season, special
precautions must be taken.
4.2 Installing the Separator
4.2.1 Check that the Wire-ring is fully pushed down into the Separator neck and that the wires are not
crossed. The upper part of the Separator (Cyclone) should rest upon the Wire-ring. Tighten the hose