10
aquatic Industries, Inc.
MOdEL
A
B
(from center of overflow pipe
(from center of
to outside rim)
drain to tub rim)
PLEASE NOTE: THE MANUFACTUrEr ACCEPTS A 1/4” VArIANCE. THErE ArE
vARiAtiONS ON EACH tUB AND SPECifiCAtiONS ARE SUBJECt tO CHANgE AS WE
iMPROvE UPON OUR PRODUCt AS REQUiRED.
tHE DiMENSiONS NEEDED fOR SitE PREPARAtiON AND StRUCtURE BUiLDiNg
WILL DIFFEr; AqUATIC INDUSTrIES, INC. ASSUMES NO rESPONSIBILITY FOr
PREPARAtORy WORk.
rOugh-iN MEASurEMENTS:
iNSTALLATiON iNSTruCTiONS
B
A
3A
See Diagram 3A, below
3B
FAST FiLL WATErFALL SPOuT:
fast fill Waterfall Spout is stubbed out
with a 3/4” female threaded PVC fitting.
fROM vALvES
your fast fill Waterfall Spout will be stubbed as in Diagram 3B.
See Diagram 3C for connecting the hot and cold valves.
3C
Infinity 1
3”
24 1/2”
Infinity 2
2 3/8”
9 1/2”
Infinity 3
1 3/8”
10 1/2”
Infinity 4
3”
11 3/4”
Infinity 5
3 1/2”
11”
Infinity 6
5”
11 3/4”
Infinity 7
5”
11”
Infinity 8
7”
14 1/2”
Infinity 9
2 1/2”
8 3/4”
CAuTiON:
do not overtighten. do not use Teflon Tape.