![Aquathin ASC25K/F Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/aquathin/asc25k-f/asc25k-f_getting-started_2961225005.webp)
5
©
2007-2013
Aquathin Corporation. All rights reserved.
C
o
n
t
e
n
t
s
1
Getting Started
7
Setting Up Your System
8
1.Unpack the System 10
2. Required Tools
11
3. Planning the Installation
11
4. Connect Control Valve to Resin Tank
12
5. Prepare Connection to Water Source
13
6. Connect Water Source to Bypass Valve
13
7. Identify Water Inlet and Outlet
15
8. Connect Cable to Meter Assembly
16
9. Connect to Drain Valve
16
10. Connect Brine Line Flow Control
16
Verify the Tubing and connections
17
1. Check Bypass Connections
17
2. Check Flow to Resin Tank
17
3. Check Drain Line
17
4. Check Flow to Brine Tank
18
Starting Your System
18
1. Plug the Unit to an Electrical Outlet
18
2. Set Water Usage Program
18
3. Add Salt to Salt Tank
20
4. Set Regeneration Knob
20
2
Getting to Know the Aquathin System
21
A Look at the Key Components 21
Manual Regeneration Knob
21
24-Hour Gear
22
Program Wheel
22
Meter Assembly
22
Clip Cabinet
23
Operating Parameters
23
Pressure
23
pH
23
Chlorine and Chloramines
23
Sediment
24