background image

3

1. Mount the IonGen

  

Control Panel

  Mount the IonGen

 Control Panel 

in the desired location, making 

sure the electrical cord reaches 

the GFI outlet. The Control Panel 

is weather resistant, but steps to 

protect it from the elements, such 

as mounting the panel above 

the ground, are recommended to 

maximize its lifespan.

 (See Fig. 1)

2. Install the Flow 

Chamber

 

  The PVC Flow Chamber for the 

IonGen

 can be located in 

several areas within the water 

feature. The Flow Chamber is 

most effective when plumbed 

directly into the water feature’s 

recirculating system. The 

Flow Chamber can also be 

submerged in a region of the 

water feature with a good  

water flow, such as in  

a skimmer box or the edge  

of a stream/waterfall. Make 

sure the electrical cord for the 

Probe reaches the Flow Chamber 

location. Follow the step-by-step 

installation instructions for the 

method you select.

Note: 

The PVC Flow Chamber is  

a standard 2-inch schd 40 PVC  

slip connection and can be made 

using PVC glue. Other fittings  

(not included) can be used to  

convert the Flow Chamber to  

fit the specific application  

requirements.

Flow Chamber Option A:
  

Plumb directly into  

recirculating system 

   Cut and insert the PVC Flow 

Chamber into the water 

feature’s recirculating system. 

The Flow Chamber should be 

positioned after the water 

feature’s pump and in a 

region of the plumbing line 

that will drain for servicing 

the replaceable Probe and 

overwintering the fitting. It is 

recommended to use a pre-

filter, such as a skimmer, prior 

to the Flow Chamber in order 

to remove solids and debris 

that may interfere with the 

Probe. A small valve box may 

be used for easy access during 

maintenance. 

(See Fig. 2)

•  Glue the PVC Flow Chamber into 

position using PVC glue (not 

included). Follow the glue  

manufacturer’s directions  

for proper steps. 

(See Fig. 3)

•  Install the Probe into the top of 

Flow Chamber. Use Teflon tape  

or a bead of silicone (not 

included) over the threads of the 

Probe fitting to ensure a water 

tight seal. The threads on the 

probe are tapered and are not de-

signed to thread completely down 

into the Flow Chamber.  Install 

the probe into the Flow Chamber 

hand tight and then one or two 

additional turns with a wrench. 

Fig. 1 

Mount the IonGen

 Control Panel 

in the desired location.

• Read the Installation Instruction 

& Maintenance Owner’s Manual 

before installing.

• Follow all local codes for  

installation.

• To reduce the risk of electric 

shock, connect only to a 

properly grounded, ground fault 

interrupter (GFI).

• Do not immerse the Control  

Box in water.

Safety Instructions

Step-by-Step Installation for the IonGen

ImPOrTANT:

 Before starting 

the IonGen

 system on existing 

water features it is recom-

mended to thoroughly clean 

the pond of as much debris as 

possible. This will maximize the 

ion’s effectiveness, and speed 

to achieve desired results. The 

more debris and dirtier the water 

feature, the longer it will take  

for the IonGen

 to provide 

noticeable results.

Fig. 2

Fig. 3

Fig. 4

Fig. 6

Fig. 5

Содержание IonGen

Страница 1: ...n Installation Instructions Maintenance Owner s Manual Made in U S A Aquascape Inc St Charles IL 60174 Brampton ON L6T 5V7 www aquascapeinc com Electronic Clarifier for Ponds and Pondless Waterfall Sy...

Страница 2: ...polarity to prevent scale and debris build up on the Probe s bars The metal alloys in the Probe are scientifically blended and tested to produce maximum results The IonGen when used according to the...

Страница 3: ...g the replaceable Probe and overwintering the fitting It is recommended to use a pre filter such as a skimmer prior to the Flow Chamber in order to remove solids and debris that may interfere with the...

Страница 4: ...s output The ionizing light will flash RED when the Probe is exhausted or the Control Panel indicates a problem See Troubleshooting Table for more information on the RED Ionizing light The Replaceable...

Страница 5: ...Flow Chamber Increase pump run time or move Flow Chamber to higher flow location Debris stuck on Probe Remove Probe and clean debris and any scale build up off bars Outside of targeted water parameter...

Страница 6: ...y Serial Number or S N is located on white label on cord Manufacture setting in Control Panel needs to be adjusted Remove back panel of Control Panel and turn the blue potentiometer screw clockwise un...

Страница 7: ...e passion 7 Guide d installation et manuel d utilisation Fabriqu aux tats Unis Aquascape Inc St Charles IL 60174 Brampton ON L6T 5V7 www aquascapeinc com Clarificateur lectronique pour bassins et casc...

Страница 8: ...ent l entartrage et l accumulation de d bris sur les lectrodes L alliage m tallique des lectrodes est scientifiquement dos et test pour donner des r sultats optimaux Le clarificateur IonGenMC lorsqu u...

Страница 9: ...o il y a un bon d bit d eau comme dans le bo tier de l cumoire ou le bord d une cascade Assurez vous que le connecteur des lectrodes atteigne la chambre d ionisation Suivez le guide tape par tape pou...

Страница 10: ...que les taux de cuivre demeurent sous 0 25 ppm Si la concentration de cuivre d passe 0 25 ppm r duisez le clarificateur IonGenMC une barre sur le voyant d ionisation ou d branchez le jusqu ce que les...

Страница 11: ...Remplacez une partie de l eau par de l eau fra che pour faire baisser plus rapidement la concentration de cuivre 7 L eau est trouble importante quantit de d bris D bit d eau insuffisant dans la chambr...

Страница 12: ...trois saisons selon l usage qui en est fait la quantit d eau traiter et les param tres de l am nagement aquatique Le voyant d ionisation qui est normalement au VERT se met clignoter en rouge lorsqu i...

Отзывы: