background image

 Before returning to your retailer, call our customer service department at  
1-888-314-2588, 8 a.m.-6 p.m., EST, Monday-Friday.   

 

 

 
 

8.  This unit also can be used in new and existing ponds and is 

an ideal way to add color to a waterfall.  For existing ponds 
with a waterfall simply re-plumb the tube/pipe that discharges 
into the existing waterfall and place the lit spillway at the top 
of the waterfall insuring that the unit is level.  Carefully cover 
the housing with natural material for a professional look.  For 
new ponds and waterfalls, this unit will take the place of a 
weir allowing for a much simpler and more natural looking 
waterfall installation.  Fig. 8 

                                                                                                       
 
                   

 

Fig. 8 

 

9.  Cut the stone that goes on the top of the spillway before building 

the next layer of stones. Or use a retaining wall block cap in place 
of the cut and add an inch of roofing shingles under the spillway.  
Fig. 9 

 

NOTE: 

The thickness of the weir is approximately 1”.  You can cut 
several pieces of stone to make this fit.                                                                                                                                    

                                                                                                                          

                                                                                                                                   
   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

Fig. 9 
 

10. Route the power cord of the pump through the hole in the tub and 

then route the tubing through the same hole.  Fig. 10 

  
 

 

                                                                                                     
 
                   

 

 

        

Fig. 10 

 

11. Remove the front screen from the pump and connect the prefilter to 

the front of the pump.  Fig. 11 

 
 
 
 
                                                                                                     
 
                   

 

 

          Fig. 11 

 
 
 
 

 

  

 

 

Pump 

Weir 

Tubing 

Содержание QDLS14B

Страница 1: ...inning any maintenance or work on the light Inspect cord for damage before installation and or maintenance Replace the entire light transformer assembly if damage is found CAUTION Use a proper power s...

Страница 2: ...how a block wall and pond installation Your lighted waterfall can be used in a variety of applications OPERATION INSTRUCTIONS 1 Select a level location to build the Lit Waterfall kit Begin building th...

Страница 3: ...TE The spillway has two ports to install the inlet For installing with this kit using connection a is preferred For other installs use b Fig 5 6 Tighten the hose clamp using a flathead screwdriver Fig...

Страница 4: ...nd waterfalls this unit will take the place of a weir allowing for a much simpler and more natural looking waterfall installation Fig 8 Fig 8 9 Cut the stone that goes on the top of the spillway befor...

Страница 5: ...the tub Fig 12 Fig 12 13 Fill the tub with water Fig 13 Fig 13 14 Connect the spillway to the transformer by pushing the plug into the transformer socket until it is firmly seated Hand tighten the nut...

Страница 6: ...disconnect the transformer from the power source Use a dryer brush to clean the inside of the spillway We recommend using a 10 long brush approximately 1 thick or any brush that will fit inside the f...

Страница 7: ...iated with the shipping handling installation or removal of products or parts subject to this warranty For products damaged in transit a claim should be filed with the carrier Disclaimer Any oral stat...

Отзывы: