
Rise
™
Installation Guide 16
The ceiling plate cannot be sited against an uneven surface. If there is coving or an
alternative obstruction, please ensure the entry hole is neat and unobtrusive; otherwise
the inner tube could be visible within the showering area.
•
!
For both concealed and exposed systems continue with instructions 25-27.
Slide the ceiling plate up to the ceiling to cover the entry hole.
24
Connect the outlet pipe to the mixed water outlet on the Quartz Smart Valve
™
. Using pipe
clips as appropriate, ensure that all pipe work is perpendicular to the Quartz Smart Valve
™
, i.e.
not putting any strain on the fittings.
Before any electrical adjustment is attempted, the electricity supply must be turned off
at the mains switch.
Electrical installation may only be carried out by a qualified person.
All copper pipe work must be cross-bonded and connected to a reliable earthing point.
•
!
25
Connect the Quartz Smart Valve
™
power lead to a double pole 3
amp fuse switched spur incorporated in the fixed wiring circuit, in
accordance with current wiring rules (refer to safety information
section). Ensure that this is located in an accessible, dry location
and not in the bathroom.
THIS APPLIANCE MUST BE EARTHED
We recommend protecting surface mounted cables in suitable approved conduit to avoid
the risk of damage from vermin.
The power lead should also be clipped in place with ‘P’ clips or similar to avoid accidents.
•
!
26