Aquatique Thermo
installation instuctions
page 7
Remove the fixing template. Using a rotary type cutter cut the inlet pipes to
length and drill and prepare the fixings for the mounting ring.
Fix the mounting ring to the wall using the screws provided.
5
Briefly run the hot and cold supplies to flush out any debris that may be
present in the system.
6
If the valve is being installed for use with a gas fired instantaneous
(multipoint) water heater or a combination boiler, the cold water flow
regulator must be fitted at this stage by insertion into the cold inlet
connection ensuring the small ‘O’ ring is facing the incoming flow,
prior to connection of the elbow assemblies.
7
Carefully slide the cover plates onto the
elbows to cover the compression fittings.
8
Place the assembly into the mounting ring
and onto the supply pipes. Tighten the
locking screw to secure the assembly to the
mounting ring using the 2.5mm hexagonal
key provided.
11
Carefully slide the dummy nuts onto the
elbows ensuring damage to the plated
surfaces is avoided.
9
Carefully locate the elbows into the valve
inlet connections and push fully home.
Using the 2.5mm hexagonal key provided,
tighten the locking screw enough to retain
the elbows in the connections whilst still
allowing ease of movement for final
adjustment.
10