![Aqualisa Aquastream Thermo Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/aqualisa/aquastream-thermo/aquastream-thermo_installation-instructions-manual_2960134009.webp)
page 9
Aquastream Thermo thermostatic integral power shower
installation instuctions
Screw in the two upper fixing screws leaving the heads projecting about
10mm from the wall surface. Feed the working end of the low voltage cable
through the entry point in the back plate. Locate the back plate in position on
the projecting screw heads. Ease the back plate downwards and engage the
screws in the slots. Fix the lower fix screw and tighten the upper fixing screws.
14
The pipe insertion depth measured from the point of entry is 50mm at 65mm
centres. Where chrome plated copper tube is to be used, it is imperative that
the plating is removed from an area measured 20-35mm to allow for full
retention by the gripper rings located in the bottom fitting.
15
Lubricate the supply pipe ends with a silicone based lubricant and push into
the unit fully home.
16
To ensure correct orientation of the on/off
shower control knob, the on/off valve shaft and
on/off knob are manufactured with a flat face
which must be aligned before the knob is fitted.
Temporarily fit the on/off control knob and
rotate fully clockwise to the off position. Turn
the supplies on to check for leaks upstream of
the unit. If all is sound, turn off the supplies.
BEFORE ANY ELECTRICAL CONNECTION IS ATTEMPTED, THE ELECTRICAL
SUPPLY MUST BE TURNED OFF AT THE MAIN SWITCH. FAILURE TO DO SO
COULD RESULT IN ELECTROCUTION.
ALL SHOWERS REQUIRING AN ELECTRICAL CONNECTION MUST BE
INSTALLED BY A QUALIFIED PERSON.
!
17
Electrical installation
Strip back approximately 10mm of insulation
on each of the wires in the low voltage cable.
Lift the connector block clear of the mounting
pins. Connect the corresponding coloured low
voltage wires into the other side of the
connection block. Refit the block back onto
the mounting pins.
18
Prior to refitting the front cover, temporarily refit the temperature lever and
rotate to the mid blend position (12 o’clock). Remove the lever and refit the
front cover by locating the bottom of the front cover into the fixing lugs and
pushing the front cover fully home. Secure using the fixing screw at the top of
the front cover ensuring not to overtighten.
19