Aqualisa Aquastream Thermo Скачать руководство пользователя страница 9

page 9

Aquastream Thermo thermostatic integral power shower

installation instuctions

Screw in the two upper fixing screws leaving the heads projecting about

10mm from the wall surface. Feed the working end of the low voltage cable

through the entry point in the back plate. Locate the back plate in position on

the projecting screw heads. Ease the back plate downwards and engage the

screws in the slots. Fix the lower fix screw and tighten the upper fixing screws.

14

The pipe insertion depth measured from the point of entry is 50mm at 65mm

centres. Where chrome plated copper tube is to be used, it is imperative that

the plating is removed from an area measured 20-35mm to allow for full

retention by the gripper rings located in the bottom fitting.

15

Lubricate the supply pipe ends with a silicone based lubricant and push into

the unit fully home.

16

To ensure correct orientation of the on/off

shower control knob, the on/off valve shaft and

on/off knob are manufactured with a flat face

which must be aligned before the knob is fitted.

Temporarily fit the on/off control knob and

rotate fully clockwise to the off position. Turn

the supplies on to check for leaks upstream of

the unit. If all is sound, turn off the supplies.

BEFORE ANY ELECTRICAL CONNECTION IS ATTEMPTED, THE ELECTRICAL

SUPPLY MUST BE TURNED OFF AT THE MAIN SWITCH. FAILURE TO DO SO

COULD RESULT IN ELECTROCUTION.

ALL SHOWERS REQUIRING AN ELECTRICAL CONNECTION MUST BE

INSTALLED BY A QUALIFIED PERSON.

!

17

Electrical installation

Strip back approximately 10mm of insulation

on each of the wires in the low voltage cable.

Lift the connector block clear of the mounting

pins. Connect the corresponding coloured low

voltage wires into the other side of the

connection block. Refit the block back onto

the mounting pins.

18

Prior to refitting the front cover, temporarily refit the temperature lever and

rotate to the mid blend position (12 o’clock). Remove the lever and refit the

front cover by locating the bottom of the front cover into the fixing lugs and

pushing the front cover fully home. Secure using the fixing screw at the top of

the front cover ensuring not to overtighten.

19

Содержание Aquastream Thermo

Страница 1: ...ctronic Equipment Producer Responsibility Regulation 2004 This product is outside the scope of the European Waste Electrical and Electronic Equipment Directive as interpreted within the UK In the UK t...

Страница 2: ...Aquastream Thermo thermostatic integral power shower installation instuctions page 2 Aquastream Aquastream Thermostatic integral power shower...

Страница 3: ...Aquastream Thermo thermostatic integral power shower installation instuctions page 3 Components...

Страница 4: ...N FOLLOWING THE LATEST REVISION OF BS 7671 WIRING REGULATIONS AND CERTIFIED TO CURRENT BUILDING REGULATIONS The Aquastream Thermo is suitable for household use only This product is not intended for us...

Страница 5: ...side of the cistern The casing must not be sited where it is subjected to continuous spray from the shower head Stored water capacities The minimum capacity of the cold storage cistern should not be l...

Страница 6: ...y point for the low voltage cable and rear entry pipe work as necessary Remove the template and prepare suitable wall fixings and entry points as required 1 Site the transformer within 4 metres cable...

Страница 7: ...entry concealed pipe work or exposed top or bottom entry pipe work Rear entry installation The 15mm supply pipes must emerge at 90 angles from the finished wall surface spaced at 65mm centres Ensurin...

Страница 8: ...lower fixing screw and tighten the upper fixing screws 10 The pipe insertion depth measured from the point of entry into the top fitting is 160mm at 65mm centres Where plate copper tube is to be used...

Страница 9: ...ed with a flat face which must be aligned before the knob is fitted Temporarily fit the on off control knob and rotate fully clockwise to the off position Turn the supplies on to check for leaks upstr...

Страница 10: ...sformer assembly THE POWER SUPPLY TO THE AQUASTREAM THERMO MUST BE ISOLATED BEFORE REINSTATING THE DOMESTIC ELECTRICAL SUPPLY ALL COPPER PIPE WORK MUST BE CROSS BONDED AND CONNECTED TO A RELIABLE EART...

Страница 11: ...itting into position into the top rail end body and secure the rail assembly to wall using the screws provided ensuring the rail and rail end bodies remain firmly engaged 27 Place the rail end covers...

Страница 12: ...e lever screws into the top threaded hole in the temperature adaptor ring about 4 turns should be sufficient 4 To set the maximum desired temperature insert a limit pin into the mid position hole in t...

Страница 13: ...aximum operating periods for this shower are 15mins on 45mins off Trouble shooting guide Check the fuse in the spur box or plug Check transformer cut out Symptom No power supply to the pump Pump fails...

Страница 14: ...60010 Republic of Ireland 01 844 3212 Brochure Hotline 0800 652 3669 Website www aqualisa co uk Email enquiries aqualisa co uk Please note that calls may be recorded for training and quality purposes...

Отзывы: