Aquastream Thermo thermostatic integral power shower
installation instuctions
page 10
Refit the temperature lever in the mid-blend
position and secure using the 3 temperature
lever screws hand tight only. Refit the on/off
control ensuring the 2 flat faces are aligned
and push fully home.
20
The 230-volt mains supply to the transformer
may be taken from the domestic lighting or
power ring main via an approved double-pole
switched fused spur outlet incorporated in the
fixed wiring circuit in accordance with the
current wiring rules. The value of the spur fuse
must not exceed 3 amps. Should the
transformer cable suffer any mechanical
damage, it will be necessary to replace the
complete transformer assembly.
THE POWER SUPPLY TO THE AQUASTREAM THERMO MUST BE ISOLATED
BEFORE REINSTATING THE DOMESTIC ELECTRICAL SUPPLY.
ALL COPPER PIPE WORK MUST BE CROSS BONDED AND CONNECTED TO
A RELIABLE EARTHING POINT.
!
21
Slider rail installation
Drill and plug two holes 642mm-655mm
vertically apart using a spirit level if necessary.
Fit the rail end clip into position and loosely fit
the lower bracket into position.
22
Pass the rail through the handset holder
whilst keeping the slider levers depressed
with the handset holder pointing in a
downward direction.
23
If the soapdish is required slide onto the rail under the handset holder.
24
Current water supply regulations state the handset should not be allowed to
pass a point 25mm above the spill over level of the bath or shower tray.
If this cannot be achieved, the hose restraint must be fitted. This is fitted to
the rail under the soapdish.
25