4
Fit the rail into the rail end bodies ensuring the indents in the rail are facing the finished wall
surface.
6
Fit the rail end covers into position and push firmly into place.
5
Secure the rail assembly to the wall using screws supplied ensuring the rail and rail end bodies remain firmly engaged.
8
Connect the hose to the bottom of the valve outlet ensuring the hose washer is correctly fitted to allow the water to
discharge safely to waste and run the shower for a few seconds to clear any debris in the outlet assembly.
9
Turn off the shower and pass the hose through the hose restraint.
10
Ensuring the hose washers are in the correct position, depress the anti-swivel locking button on the
handset and secure the handset to the hose. Place the handset into the handset holder.
7
If required, optional outlet flow regulators can be purchased from the Aqualisa customer helpline on 01959 560010.
Fit the relevant flow regulator into the brass housing ensuring the O’ring faces the incoming flow. Connect the flow
regulator assembly to the valve outlet ensuring the hose washer is correctly fitted.
!
6lpm outlet flow regulators are not suitable for products fitted to combination boiler systems.
The tension of the handset station of the handset holder is factory set. However, it may be
necessary, especially for showers fitted to high pressure systems, to tighten the tension as
required. Tighten the screw inside the handset station taking care not to over-tighten.
!
12
AQ100 AQ75:Midas 8/9/15 13:54 Page 12
Содержание 3245F
Страница 19: ...AQ100 AQ75 Midas 8 9 15 13 54 Page 19...