6
Ensuring the fibre washers are positioned within the valve inlets, offer the valve into position.
Tighten the fixing nuts using a suitable tool taking care not to overtighten.
7
Attach the hose to the valve hose outlet to allow the water to discharge safely to waste.
Turn on the supplies to the shower and turn the shower on to flush the system through.
Turn off the shower.
If required, refer to the commissioning instructions on page 14 to adjust the maximum temperature override button position.
11
5
Apply a thin bead of mastic to the rear of the cover plates. Place the cover plates onto the exposed
¾” threads, flush with the finished wall surface.
1
Hold the front and rear of the grey rail end and carefully, but firmly, pull the chrome cover away
from the rail end assembly as shown.
2
Prepare two fixing points 585mm vertically apart using a spirit level to facilitate if necessary using the fixings supplied.
3
Ensuring the handset cradle is on the left side of the rail, pass the rail through the handset
holder whilst keeping the slider button depressed.
Aqualisa AQ75 adjustable height head installation
AQ100 AQ75:Midas 8/9/15 13:54 Page 11
Содержание 3245F
Страница 19: ...AQ100 AQ75 Midas 8 9 15 13 54 Page 19...